30–100T Marine Quick Release Towing Hook | Manual Release for Tugboats and Work Vessels
Product Overview
The marine quick release towing hook is a vessel-mounted towline connection device for tugboats, workboats, engineering vessels, floating docks, and other marine units that require a controlled towline release point. The hook retains the towline eye during towing and is released locally through the manual release arrangement specified for this product page.
The hook assembly transfers towing force through the hook body, pivot connection, locking mechanism, mounting base, and supporting vessel structure. Selection therefore requires confirmation of SWL, towline arrangement, expected lead angle, foundation design, release method, inspection scope, and class requirement. This product is a towing hook, not a lifting hook, not a towing winch, and not a dock-mounted multiple quick release mooring hook.
Quick Specifications
Main Technical Parameters
| SWL(t) | A(mm) | B(mm) | L(mm) | R1(mm) | R2 |
| 30 | 210 | 340 | 1050 | 65 | 430 |
| 40 | 220 | 345 | 1100 | 65 | 450 |
| 50 | 276 | 448 | 1332 | 80 | 577 |
| 60 | 295 | 475 | 1415 | 85 | 613 |
| 80 | 350 | 560 | 1680 | 100 | 721 |
| 100 | 450 | 630 | 2100 | 125 | 921 |
Selection & Inquiry Guide
Step 1: Confirm the required SWL according to the vessel towing plan, tug bollard pull, towline MBL, expected dynamic loading, and naval architect or class calculation. Do not select the hook by vessel deadweight alone.
Step 2: Confirm towline eye or shackle size, hook throat requirement, towing lead direction, expected horizontal and vertical angles, and whether side loading may occur.
Step 3: Confirm the installation position, available deck space, foundation arrangement, structural reinforcement, connection method, and load transfer into the vessel structure.
Step 4: Confirm the release arrangement. This page covers local manual release; pneumatic or hydraulic remote release requires a separate approved configuration and control-system scope.
Step 5: Confirm material grades, corrosion-protection system, lubrication and maintenance access, NDT requirement, test procedure, witnessing, and certificate scope before quotation.
Step 6: Provide selected SWL, quantity, vessel type, installation drawing, towline information, class society, destination, and required delivery time.
Structure
Towing hook body | Hook pivot connection | Locking and release mechanism | Local manual release lever / wire interface | Mounting base | Vessel foundation interface | Protective coating
Towing, Release and Installation Advantages
Custom Attributes
How It Works
Towline eye is placed on the hook → Locking mechanism retains the hook in the towing position → Towing load passes through the hook and mounting structure → Operator actuates the approved manual release → Hook opens and releases the towline → Mechanism is inspected and reset
Applications
Harbor tugboats | Coastal and river tugs | Workboats | Engineering vessels | Floating docks | Dry-dock service craft | Marine construction support vessels | Replacement towing-hook projects
Certifications & Advantages
Certificates and survey attendance can be arranged according to project requirement, approved test scope, material traceability, and classification society procedure. Availability is subject to technical review and class approval.
Certification: CCS, NK, BV, ABS, DNV, LR, KR, IRS, RS, RINA, CRS, Makers Test Certificate.
Drawing & Photos


FAQ
Q1: How should the correct towing hook SWL be selected?
A1: Selection should consider the vessel towing plan, tug bollard pull, towline MBL, dynamic loading, tow angle, connection geometry, and class or naval architect requirements. The hook SWL should not be selected from vessel deadweight alone.
Q2: Can this hook be released while the towline is loaded?
A2: The supplied description states release under slack or safe working load conditions, but the permitted release load must be confirmed for the exact model through the approved design, operating instructions, and witnessed test procedure. It should not be treated as an unrestricted under-load release claim.
Q3: What installation information is required before production?
A3: Provide the vessel foundation drawing, installation position, load direction and allowable angles, towline or shackle details, selected SWL, release-wire arrangement, material and coating requirements, class society, and required inspection scope.