Specifications
Brand Name :
Zhonghai Bailey Bridge
Model Number :
CB200/CB321
Certification :
IS09001, CE
Place of Origin :
China
MOQ :
1 Pcs
Price :
USD 95-450
Payment Terms :
L/C,D/P,T/T
Supply Ability :
60000ton/year
Delivery Time :
8-10 work days
Packaging Details :
Naked
Standard :
ASTM,GB,BS,BV
Packing :
Packing in Containers or Bulk
Dimensions :
Standard or Customized
Ramp :
6m,9m,12m
Name :
Bailey Bridge
Lane :
Single lane 4.2m,Double Lane 7.35m
Panel Size :
3000mm*1400mm
Surface Finish :
Pained or Galvanized
Description

Steel Panel Bridge/temporary Steel Panel Bridge


Using zinc-rich primer coatings on steel bridges offers several significant benefits that enhance durability, reduce maintenance, and provide long-term protection against corrosion:


1. **Cathodic Protection**
Zinc-rich primers provide cathodic protection due to their high zinc content (typically 60-90%). Zinc acts as a sacrificial anode, corroding preferentially over the steel. This means that even if the coating is breached, the underlying steel remains protected from corrosion.


2. **Barrier Protection**
The epoxy resin in zinc-rich primers forms a tight, impermeable barrier over the steel surface. This barrier physically blocks water, oxygen, and other corrosive elements from reaching the steel, significantly reducing the risk of rust and corrosion.


3. **Long-Term Durability**
Zinc-rich primers offer long-term protection by combining both cathodic and barrier protection mechanisms. This dual protection extends the lifespan of steel structures, reducing the need for frequent maintenance and replacements.


4. **Versatility and Adaptability**
These primers are highly versatile and can be used in a wide range of environments, from marine settings to industrial facilities. They are particularly effective in harsh conditions where steel is exposed to salt spray, high humidity, and industrial chemicals.


5. **Cost-Effectiveness**
By prolonging the lifespan of steel structures and reducing maintenance needs, zinc-rich primers offer substantial cost savings over time. The initial investment in high-quality coatings pays off through reduced maintenance and longer service life.


6. **Reduced Maintenance**
Zinc-rich primers continue to protect the steel even if the topcoat is breached, making them a superior choice for long-term corrosion resistance. This reduces the frequency of maintenance and the associated costs.


7. **Chemical Resistance**
The epoxy resin component in zinc-rich primers provides additional chemical resistance, further aiding in preventing rust-inducing reactions with other chemicals.


8. **Self-Healing Properties**
Some advanced zinc-rich primers incorporate conductive polymers or other additives that enhance their self-healing properties. These materials can rebuild the protective layer if it is damaged, ensuring continuous protection.


Conclusion
Zinc-rich primer coatings are a highly effective solution for protecting steel bridges from corrosion. Their combination of cathodic and barrier protection, long-term durability, and cost-effectiveness make them an ideal choice for ensuring the longevity and reliability of steel structures.



Specifications:

CB200 Truss Press Limited Table
NO. Internal Force Structure Form
Not Reinforced Model Reinforced Model
SS DS TS QS SSR DSR TSR QSR
200 Standard Truss Moment(kN.m) 1034.3 2027.2 2978.8 3930.3 2165.4 4244.2 6236.4 8228.6
200 Standard Truss Shear (kN) 222.1 435.3 639.6 843.9 222.1 435.3 639.6 843.9
201 High Bending Truss Moment(kN.m) 1593.2 3122.8 4585.5 6054.3 3335.8 6538.2 9607.1 12676.1
202 High Bending Truss Shear(kN) 348 696 1044 1392 348 696 1044 1392
203 Shear Force of Super High Shear Truss(kN) 509.8 999.2 1468.2 1937.2 509.8 999.2 1468.2 1937.2
Steel Panel Temporary Pedestrian Bridge  Double Lane 7.35m 3000mm*1400mm Panel SizeSteel Panel Temporary Pedestrian Bridge  Double Lane 7.35m 3000mm*1400mm Panel SizeSteel Panel Temporary Pedestrian Bridge  Double Lane 7.35m 3000mm*1400mm Panel SizeSteel Panel Temporary Pedestrian Bridge  Double Lane 7.35m 3000mm*1400mm Panel Size

​​

CB200 Table of Geometric Characteristics of Truss Bridge(Half Bridge)
Structure Geometric Characteristics
Geometric Characteristics Chord Area(cm2) Section Properties(cm3) Moment of Inertia(cm4)
ss SS 25.48 5437 580174
SSR 50.96 10875 1160348
DS DS 50.96 10875 1160348
DSR1 76.44 16312 1740522
DSR2 101.92 21750 2320696
TS TS 76.44 16312 1740522
TSR2 127.4 27185 2900870
TSR3 152.88 32625 3481044
QS QS 101.92 21750 2320696
QSR3 178.36 38059 4061218
QSR4 203.84 43500 4641392
Steel Panel Temporary Pedestrian Bridge  Double Lane 7.35m 3000mm*1400mm Panel SizeSteel Panel Temporary Pedestrian Bridge  Double Lane 7.35m 3000mm*1400mm Panel SizeSteel Panel Temporary Pedestrian Bridge  Double Lane 7.35m 3000mm*1400mm Panel SizeSteel Panel Temporary Pedestrian Bridge  Double Lane 7.35m 3000mm*1400mm Panel Size

​​

CB321(100) Truss Press Limited Table
No. Lnternal Force Structure Form
Not Reinforced Model Reinforced Model
SS DS TS DDR SSR DSR TSR DDR
321(100) Standard Truss Moment(kN.m) 788.2 1576.4 2246.4 3265.4 1687.5 3375 4809.4 6750
321(100) Standard Truss Shear (kN) 245.2 490.5 698.9 490.5 245.2 490.5 698.9 490.5
321 (100) Table of geometric characteristics of truss bridge(Half bridge)
Type No. Geometric Characteristics Structure Form
Not Reinforced Model Reinforced Model
SS DS TS DDR SSR DSR TSR DDR
321(100) Section properties(cm3) 3578.5 7157.1 10735.6 14817.9 7699.1 15398.3 23097.4 30641.7
321(100) Moment of inertia(cm4) 250497.2 500994.4 751491.6 2148588.8 577434.4 1154868.8 1732303.2 4596255.2
Steel Panel Temporary Pedestrian Bridge  Double Lane 7.35m 3000mm*1400mm Panel SizeSteel Panel Temporary Pedestrian Bridge  Double Lane 7.35m 3000mm*1400mm Panel SizeSteel Panel Temporary Pedestrian Bridge  Double Lane 7.35m 3000mm*1400mm Panel SizeSteel Panel Temporary Pedestrian Bridge  Double Lane 7.35m 3000mm*1400mm Panel Size


Advantage

Possessing the features of simple structure,
convenient transport, speedy erection
easy disassembling,
heavy loading capacity,
great stability and long fatigue life
being capable of an alternative span, loading capacity



Steel Panel Temporary Pedestrian Bridge  Double Lane 7.35m 3000mm*1400mm Panel Size

Send your message to this supplier
Send Now

Steel Panel Temporary Pedestrian Bridge Double Lane 7.35m 3000mm*1400mm Panel Size

Ask Latest Price
Watch Video
Brand Name :
Zhonghai Bailey Bridge
Model Number :
CB200/CB321
Certification :
IS09001, CE
Place of Origin :
China
MOQ :
1 Pcs
Price :
USD 95-450
Contact Supplier
video
Steel Panel Temporary Pedestrian Bridge  Double Lane 7.35m 3000mm*1400mm Panel Size

Jiangsu Zhonghai Bridge Equipment Co.,LTD

Verified Supplier
1 Years
jiangsu, zhenjiang
Since 2014
Business Type :
Manufacturer
Total Annual :
20753202.90-27670940.00
Employee Number :
100~150
Certification Level :
Verified Supplier
Contact Supplier
Submit Requirement