| Product Name | CNC Turning Milling Parts |
|---|---|
| Material Available | Aluminum |
| Processing | CNC Turning Milling |
| Tolerance | ±0.002~0.005mm |
| Drawing Accepted | IGES(igs), STEP(stp), SolidWorks (sodprt), PRT, AutoCad, or Samples |
| Inspection | CMM, Projector, Height Gauge, etc. |
| Lead Time | 7~35 working days |
| Quality Assurance | ISO9001:2015, SGS, RoHs |
| Payment Term | MoneyGram, Western Union, T/T, D/P, D/A, L/C |
| Price | According to your drawing or requirements |
| Packaging | Bubble and Carton or Customization |
|---|---|
| Port | Shenzhen |

| Material Group | Specific Grades | Machinability Rating | Recommended Cutting Parameters | Primary Applications |
|---|---|---|---|---|
| Aluminum Alloys | 6061, 7075, 2024, 5083, MIC-6 | Excellent | HS: 600-3000 m/min, DOC: 0.5-5mm | Aerospace, automotive, electronics, enclosures |
| Stainless Steels | 303, 304, 316, 17-4PH, 15-5PH, 416 | Fair to Good | HS: 50-120 m/min, DOC: 0.5-3mm | Medical, marine, chemical, food processing |
| Tool Steels | D2, A2, O1, H13, P20, S7 | Fair to Difficult | HS: 40-100 m/min, DOC: 0.2-2mm | Molds, dies, tooling, wear components |
| Carbon & Alloy Steels | 1018, 1045, 4140, 4340, 8620 | Good to Excellent | HS: 100-250 m/min, DOC: 1-5mm | Machine components, automotive, industrial |
| Titanium Alloys | Grade 2, Grade 5 (Ti6Al4V), Grade 23 | Difficult | HS: 30-70 m/min, DOC: 0.5-2mm | Aerospace, medical implants, chemical |
| Copper Alloys | C110, C360, C172, C932 | Excellent to Good | HS: 150-500 m/min, DOC: 0.5-4mm | Electrical, thermal, bearing, decorative |
| High-Temp Alloys | Inconel 718, Hastelloy, Waspaloy | Very Difficult | HS: 10-30 m/min, DOC: 0.2-1mm | Aerospace, turbine, extreme environment |
| Magnesium Alloys | AZ31B, AZ91D, WE43 | Excellent (with precautions) | HS: 300-1500 m/min, DOC: 1-5mm | Aerospace, racing, electronics (lightweight) |
| Material Type | Specific Varieties | Key Considerations | Applications |
|---|---|---|---|
| Engineering Plastics | PEEK, Delrin, Nylon, PTFE, POM, UHMW | Low thermal conductivity, prone to melting, vibration damping | Medical, bearings, insulators, low friction |
| Advanced Composites | Carbon Fiber, G10/FR4, Fiberglass | Abrasive, layered structure, delamination risk | Aerospace, sporting goods, electronics |
| Precision Ceramics | Alumina, Zirconia, Macor | Extremely hard, brittle, specialized tooling required | Semiconductor, medical, wear components |
| Graphite & EDM Materials | ISO-63, POCO, GrafTech | Dust control, specialized tooling | EDM electrodes, thermal, crucibles |
| Technique | Description | Applications | Benefits |
|---|---|---|---|
| High-Speed Machining | High spindle speeds with reduced chip loads | Aluminum, graphite, plastics | Reduced cycle times, improved surface finish |
| Hard Milling | Machining materials >45 HRC directly | Tool steels, hardened steels | Eliminates EDM, better surface integrity |
| Trochoidal Milling | Constant engagement circular tool paths | Deep slots, difficult materials | Reduced tool wear, higher material removal |
| Micro-Milling | Small tools (<1mm diameter) | Medical devices, micro-optics, electronics | Precision small features, fine details |
| 5-Axis Simultaneous | Continuous tool orientation control | Turbine blades, impellers, complex geometries | Single setup completion, complex contours |

| Production Type | Standard Lead Time | Expedited Options | Factors Affecting Lead Time |
|---|---|---|---|
| Prototype (1-10 pcs) | 5-15 business days | 3-5 days (+30-50%) | Material availability, complexity, fixturing |
| Low Volume (10-100 pcs) | 10-25 business days | 5-10 days (+25-40%) | Tooling requirements, secondary operations |
| Medium Volume (100-1,000 pcs) | 3-5 weeks | 2-3 weeks (+20-35%) | Production scheduling, capacity |
| High Volume (1,000+ pcs) | 6-12 weeks | 4-8 weeks (+15-30%) | Material procurement, dedicated production runs |
| Large Parts (>1m dimension) | 4-10 weeks | 3-6 weeks (+25-50%) | Special handling, machine availability |