| Product Name | CNC Turning Milling Parts |
|---|---|
| Material Available | ABS |
| Processing | CNC Turning and Milling |
| Tolerance | +/-0.002~0.005mm |
| Drawing Accepted | IGES(igs), STEP(stp), SolidWorks (sodprt), PRT, AutoCad, or Samples |
| Inspection | CMM, Projector, Height Gauge, etc. |
| Lead Time | 7~35 working days |
| Quality Assurance | ISO9001:2015, SGS, RoHs |
| Payment Term | MoneyGram, Western Union, T/T, D/P, D/A, L/C |
| Price | According to your drawing or requirements |
| Packaging | Bubble and Carton or Customization |
|---|---|
| Port | Shenzhen |

| Operation | Equipment Used | Capability/Specification |
|---|---|---|
| CNC Milling | 3/4/5-axis mills | Cross-holes, flats, keyways, complex features |
| Drilling/Tapping | CNC drill units | Deep hole (up to 10* diameter), micro-drilling (Ø0.3mm+) |
| Grinding | Cylindrical grinders | ID/OD grinding, surface grinding |
| Heat Treatment | Vacuum furnaces | Hardening, tempering, stress relieving, annealing |
| Welding | TIG, laser welders | Precision welding for assemblies |
| Assembly | Cleanroom facilities | Press fits, adhesive bonding, mechanical fastening |
| Finish Type | Process | Typical Ra Value | Characteristics |
|---|---|---|---|
| As-Machined | CNC turned | 0.8-3.2μm | Cost-effective, tool marks visible |
| Polished | Mechanical polishing | 0.1-0.4μm | Reflective, smooth, cosmetic quality |
| Anodized | Type II/III anodizing | 0.4-1.6μm | Decorative, corrosion resistant (Al) |
| Plated | Electroplating | Varies | Chrome, nickel, zinc, tin coatings |
| Passivated | Chemical treatment | Base material finish | Corrosion resistance (stainless) |
| Painted/Powder Coated | Spray application | Varies | Color options, additional protection |
| Black Oxide | Chemical conversion | Base material finish | Mild corrosion resistance, appearance |

| Order Type | Typical Lead Time | Notes |
|---|---|---|
| Prototype/Samples | 5-10 business days | Standard materials, simple geometries |
| Low Volume (1-100 pcs) | 10-20 business days | Includes setup and first article inspection |
| Medium Volume (100-1,000 pcs) | 3-4 weeks | Batch production with process optimization |
| High Volume (1,000+ pcs) | 4-8 weeks | Dedicated production runs, tooling optimization |
| Expedited Services | 50-100% premium | Available for urgent requirements |