Introduction of Customized pressure 12 bar 350kw gas fired steam boiler
The boiler adopts a fully automatic microcomputer control system, equipment operation is automatically controlled, with overpressure and water shortage interlocking protection functions, and the biomass feed system adopts the design concept of planetary oblique feed, which eliminates the phenomenon of biomass burning fuel back-burning.
Full automatic control. Just connect the water and electricity; press the key, then the boiler will automatically enter the automatic running, safer and more convenient. 4.Built-in steam separator solves the problem of steam with water to ensure the quality of the steam.
Technical parameters of Customized pressure 12 bar 350kw gas fired steam boiler
Item | Horizontal |
YDZ0.5-1.2-Q |
Rated evaporation | Kg/h | 500 |
Rated pressure | Mpa | 1.2 |
Rated steam temperature | ℃ | 191 |
Design thermal efficiency | % | 93 |
Water capacity | L | <29 |
Steam outlet | DN | 32 |
Water intake | DN | 25 |
Drain valve | DN | 25 |
Dimensions | L | mm | 2700 |
W | mm | 1600 |
H | mm | 2400 |
Shipping weight | T | 3.7 |
Full load gas consumption | m³/h | 39 |
Application of Customized pressure 12 bar 350kw gas fired steam boiler
Textile industry: shrinking machine, dry cleaning machine, dryer, washing machine, dehydration machine, printing, ironing machine, iron and other equipment.
Food machinery industry: steamer, tofu machine, sterilization tank, packaging machines, paint equipment, sealing machines and other equipment.
Other industries: automotive steam cleaning industry, hotels, hotels, schools, enterprises and other hot water supply, bridges, railway concrete conservation and other industries.
Henan Swet Boiler Co.,Ltd
Henan Swet (original name Desheng) Boiler Co.Ltd was established in 1954. SWET controls the boiler quality with a complete system of arrangement, production and inspection. Boiler production permit, material purchasing, steel plant cutting, boiler proper welding, water pressure and x-ray test all handled by qualified worker and welder, and inspected by professional person from Chinese National Boiler Inspection Institution. Factory equips with physical and chemical laboratory to test the material and confirm all steel plate and tube are qualified.