IEC 62893 2C×70mm2+1C×25mm2+(6C×0.75mm2+W)+W EV Cable with EVI-2 Insulation EVM-1 Jacket
| Construction | |||||
| A:2C×70mm2 | B:1C×25mm2 | C:6C×0.75mm2 | |||
| Conductor | Bare copper stranded | ||||
| Cross section | 70mm2 | 25mm2 | 0.75mm2 | ||
| Construction | 2257/0.20mm | 798/0.20mm | 40/0.15mm+Tinsel+ Kevlar | ||
| Strand Dia.(Ref.) | 11.80mm | 7.00mm | 1.30mm | ||
| Insulation | EVI-2 | ||||
| Nom.Thickness | 1.20mm | 1.00mm | 0.40mm | ||
| Min.Thickness | 0.96mm | 0.80mm | 0.32mm | ||
| Insulation Dia. | 14.60±0.60mm | 9.30±0.40mm | 2.20±0.05mm | ||
| Insulation colour | A1.brown A2.blue | yellow/green | 1.white 2.gray 3.orange 4.pink 5.black 6.purple |
||
| Filler | / | / | PP rope | ||
| Tape | / | / | Non woven | ||
| Filler | PP rope | ||||
| Tape | Non woven | ||||
| Assembly | 2C×35mm2+1C×25mm2+(6C×0.75mm2+W)+W | ||||
| Jacket | EVM-1 | ||||
| Nom.Thickness | 2.50mm | ||||
| Min.Thickness | 2.00mm | ||||
| Outer Dia. | 35.50±1.50mm | ||||
| Colour | per request | ||||
Product Description
Application:This Product is applicable for all kinds of electric vehicles,charging ppiles, power station, charging station.
Product character:
Tensile strength:≥20MPa Elongation:≥300%
Aged condition:110±1℃×168h
Percent of original tensile strength:±30%
Percent of original elongation: ±30%
Technical data
Rated voltage:1.5KV DC
Rated Temperature: -40-90℃
Max.conductor DC resistance(20℃):A:0.272Ω/km B:0.78Ω/km C:26Ω/km
Dielectric Strength AC: 7.0kV/5min
Properties
Effectively resist electromaganetic interference
Excellent insulation performance
Extensively Flame resistant
Flexible