Specifications
MOQ :
1000m
Delivery Time :
3-4 Weeks
Voltage :
1.5KV DC
SP :
2200253
Certification :
RoHS Reach
Insulation :
EVI-2
Model Number :
IEC 12893
Conductor :
Bare Copper Stranded
Price :
To be negotiated
Temperature :
-40~90℃
Supply Ability :
100km per day
Packing :
Packed in rolls or reels
Brand Name :
Shineplus
Name :
EV Charging Cable
Payment Terms :
T/T,L/C,Western Union
Application :
EV Charging
Packaging Details :
Packed in rolls or reels
Place of Origin :
China
Jacket :
EVM-1
Description

IEC 62893 2C×16mm2+1C×25mm2+6C×0.75mm2+W EV Charging Cable Bared Copper Stranded with EVI-2 Insulation and EVM-1 Jacket 1.5KV DC

Construction
A:2C×16mm2 B:1C×25mm2 C:6C×0.75mm2
Conductor Bare copper stranded
Cross section 16mm2 25mm2 0.75mm2
Construction 511/0.20mm 798/0.20mm 40/0.15mm+Tinsel+ Kevlar
Strand Dia.(Ref.) 5.80mm 7.00mm 1.30mm
Insulation EVI-2
Nom.Thickness 0.80mm 1.00mm 0.40mm
Min.Thickness 0.64mm 0.80mm 0.32mm
Insulation Dia. 7.60±0.30mm 9.30±0.40mm 2.20±0.05mm
Insulation colour A1.brown A2.blue yellow/green 1.white 2.gray 3.orange
4.pink 5.black 6.purple
Filler / / PP rope
Tape / / Non woven
Filler PP rope
Tape Non woven
Assembly 2C×16mm2+1C×25mm2+(6C×0.75mm2+W)+W
Jacket EVM-1
Nom.Thickness 1.50mm
Min.Thickness 1.20mm
Outer Dia. 23.30±1.50mm
Colour per request

Product Description
Application:EV Charging

This Product is applicable for all kinds of electric vehicles,charging piles, power station, charging station.


Product character:
Tensile strength:≥20MPa

Elongation:≥300%
Aged condition:110±1℃×168h
Percent of original tensile strength:±30%
Percent of original elongation: ±30%
VW-1

Technical data
Rated voltage:1.5KV DC
Rated Temperature: -40~90℃
Max.conductor DC resistance(20℃):A:1.21Ω/km B:0.78Ω/km C:26Ω/km
Dielectric Strength AC:7.0kV/5min

Properties
Effectively resist electromaganetic interference
Excellent insulation performance
Extensively Flame resistant

IEC 62893 EV Charging Cable Bared Copper Stranded With EVI-2 Insulation / EVM-1 Jacket 1.5KV DC

Send your message to this supplier
Send Now

IEC 62893 EV Charging Cable Bared Copper Stranded With EVI-2 Insulation / EVM-1 Jacket 1.5KV DC

Ask Latest Price
Watch Video
MOQ :
1000m
Delivery Time :
3-4 Weeks
Voltage :
1.5KV DC
SP :
2200253
Certification :
RoHS Reach
Insulation :
EVI-2
Contact Supplier
video
IEC 62893 EV Charging Cable Bared Copper Stranded With EVI-2 Insulation / EVM-1 Jacket 1.5KV DC
IEC 62893 EV Charging Cable Bared Copper Stranded With EVI-2 Insulation / EVM-1 Jacket 1.5KV DC

Guangdong Shineplus Connection Technology Co.,LTD

Verified Supplier
1 Years
jiangsu, nantong
Since 2021
Business Type :
Manufacturer
Total Annual :
200000000-460000000
Employee Number :
80~100
Certification Level :
Verified Supplier
Contact Supplier
Submit Requirement