Tensile Strength: ≥813 MPa (Ensures resistance to burst/collapse under high downhole pressures).
Yield Strength: ≥690 MPa (Withstands heavy loads during drilling operations without permanent deformation).
Elongation: ≥15% (Absorbs shock loads and vibrations, reducing the risk of brittle fracture in harsh environments).
Balanced hardness for wear resistance (protects against abrasion from drilling cuttings) while maintaining machinability and impact toughness.
Stress relief annealing minimizes internal stresses from manufacturing, ensuring dimensional stability and preventing cracking during service.
Chromium-Molybdenum (Cr-Mo) alloy enhances:
Suitable for oil/gas well drilling, geothermal wells, and mineral exploration where high strength-to-weight ratio and reliability are paramount.
Ⅰ. Higher Safety – Lower risk of failure under extreme pressures/temperatures.
Ⅱ. Cost-Effective – Balances performance and affordability compared to premium alloys (e.g., 4140).
Ⅲ. Global Standards Compliance – Meets API and industry specifications for critical drilling operations.
Chemical Composition
Steel Grade | C | Si | Mn | P | S | Cr | Mo | B |
4130 | 0.28-0.33 | 0.15-0.35 | 0.40-0.60 | ≤0.040 | ≤0.040 | 0.80-1.10 | 0.15-0.25 | |
4140 | 0.38-0.43 | 0.15-0.35 | 0.75-1.00 | ≤0.040 | ≤0.040 | 0.80-1.10 | 0.15-0.25 | |
45MnMoB | 0.43-0.48 | 0.17-0.37 | 1.05-1.35 | ≤0.020 | ≤0.015 | 0.20-0.25 | 0.001-0.005 | |
1541 | 0.36-0.44 | - | 1.35-1.65 | ≤0.040 | ≤0.050 | |||
30CrMnSiA | 0.28-0.34 | 0.90-1.20 | 0.80-1.10 | ≤0.020 | ≤0.015 | 0.80-1.10 |
Steel Grade | Deliver Condition | Tensile Strength (Mpa) | Yield Strength (Mpa) | Elongation (%) | Hardness(HRC) |
4130 | + SR | ≥813 | ≥690 | ≥15% | ≥24 |
4140 | QT | ≥950 | ≥850 | ≥14% | 28 - 33 |
45MnMoB | + N | ≥790 | ≥600 | ≥14% | - |
1541 | + SR | ≥813 | ≥690 | ≥15% | ≥24 |
30CrMnSiA | QT | ≥850 | ≥750 | ≥14% | 26 - 31 |
FAQ:
1. Can you provide a sample to check the quality?
We can provide free sample with same or similar sizes for you to check tube quality.
You need to in charge of Express costs.
2. How about your production capacity?
3000 tons/Month.
3. What are your terms of payment?
30%TT in advance, Balance to be paid before shipment.
4. Where is your factory?
Zhangjiagang city, 1.5 hours away from Shanghai.
5. How can I get the quotation A.S.A.P?
Please send us an inquiry with full details as following,quotation will sent to you A.S.A.P:
1). Tube Standard
2). Steel Grade
3). Tube Size and Size Tolerance
4). Tube length
5). Quantity
6). If any special requirements
6. How about the minimum order quantity?
Normally for one size above 1 ton.
Welcome to contact us! Thanks.