Specifications
Brand Name :
YDX
Model Number :
YDX123
Certification :
ISO,BV.SGS,CE
Place of Origin :
CHINA,QINGDAO
MOQ :
10-10000 square meters
Price :
$30.00-$65.00
Payment Terms :
L/C,T/T,Western Union,MoneyGram
Supply Ability :
10000 tons/month
Delivery Time :
20-30 works days
Packaging Details :
Exported standard packing
Steel Grade :
Q235B Q345b Low Carbon Steel
Main Structure :
Hot Rolled or Welded H Section, I Section
Connect :
All Bolt Connection(High-Strength and Normal Bolt)
Roof/wall material :
Single Sheet or Sandwich Panel
Usage :
Steel Structure Platform, Steel Workshop, Structural Roofing, Steel Walkway and Floor, Steel Fabricated House, Frame Part, Steel Structure Bridge
Door :
Sliding Door or Rolling Door
Structure Type :
Frame
Frame Type :
Steel Frame
Earthquake Resistance :
Strong
Windows :
Aluminum
Seismic Design :
High Seismic Zone
Installation Time :
Short
Aesthetics :
Modern
Construction Type :
Frame
Cost :
Moderate
Product Resistance :
Corrosion Resistant
Finish :
Galvanized/Painted/Cladding
Roof :
Glass Wool, EPS, PU
Product Fire Resistance :
Fireproof
Description

Pre engineering building material steel structure warehouse


1. Free to design architectural drawings for you;
2. Features: Fast and flexible to assemble, safe, thermal and noise insulation, water proof and fire prevention;
3. Cost-effective: Fast and easy installation greatly shorten the construction time which reduce the costs;
4. Durability: The whole structure is easy in maintenance, which can be used for more than 50 years.
5. Perfect design: Perfect design completely avoids leaks and water seepage. Meanwhile, it's also in line with the national level of fire prevention.
6. Carrying capacity: can resists the impact of strong wind and seismic
performance and bears heavy snow loads

Steel structure Design Low Carbon Food Plant Steel Structure warehouse


Base Cement and steel foundation bolt
Main frame H beam
Material Q235B, Q345B or others as buyers' requests
Purlin C or Z purlin: Size from C120~C320, Z100~Z20
Bracing X-type or other type bracing made from angle, round pipe
Bolt Plain bolt and High-strength bolt
Roof & wall Sandwich panel or color plate
Door Sliding or rolling door
Window Aluminium alloy window
Surface Two times of Anti-rust Painting or Hot Dip Galvanized
Sheet 0.5mm or 0.6mm galvanized sheet
Accessories Semi-transparent skylight belts, Ventilators,down pipe, galvanized gutter, etc



After the laying is completed, find the rules for the anchor bolts. Strictly position according to the axis and elevation provided.

Find the rules: It is required that all anchor bolts are aligned and the steel columns are placed in a straight line.


H Beam Pre Engineering Steel Building Steel Structure Industrial Warehouse Construction

H Beam Pre Engineering Steel Building Steel Structure Industrial Warehouse Construction


When hoisting steel columns, the foundation nuts should be leveled in advance. During hoisting, no one is allowed to stand within the lifting range of the crane. After the steel columns are basically in place, people should install them. The anchor nut should be tightened.

H Beam Pre Engineering Steel Building Steel Structure Industrial Warehouse Construction

Lifting of steel beams after assembly: After the construction of steel column tie rods/column supports is completed, the steel beams will be lifted

H Beam Pre Engineering Steel Building Steel Structure Industrial Warehouse Construction

Tie rod connection between steel beams: must achieve bolt tightening and consistent direction

The roof steel beams use high-strength bolts and do not require welding.

Platform beams are divided into main beams and secondary beams: the main beams are generally welded, and the wing plates are welded. Secondary beams are generally not welded.

H Beam Pre Engineering Steel Building Steel Structure Industrial Warehouse Construction

Roof inner panel completed

H Beam Pre Engineering Steel Building Steel Structure Industrial Warehouse Construction

Finished photo

H Beam Pre Engineering Steel Building Steel Structure Industrial Warehouse Construction

Installation:

Method 1: We provide shop drawing before installation.

Method 2: If you still don't know how to install, We will teach you the installation in our factory. when necessary , we will assemble a sample steel structure building for you.

H Beam Pre Engineering Steel Building Steel Structure Industrial Warehouse Construction

Packing & Loading:

All the structure components, panels,bolts and sort of accessories will bewell packed with standard package suitable ocean transportation and loaded into 40’HQ.

All the products are loaded at the loading site of our factory using crane and forklift by our skilled workers,who will prevent the goods to be damaged.

H Beam Pre Engineering Steel Building Steel Structure Industrial Warehouse Construction

Why us?

1. Professional design team, we could design the drawing as your requirement or calculate the steel quantity based on your drawing.

2. Skilled fabrication team and advanced equipment. We make the independent production schedule to each project.

3. One-stop service: We have completed lots such kinds of projects, we could provide the integrated proposal for your project.

4. Professional QC team will guarantee that we will provide the production and service as your request.

5. After sales service: If it has any questions that need us to do in your process of using, such as the maintain of outside insulation and steel components, just tell us , we will try to provide the service as well as we can.

1 Location (where will be built?) _____country, area
2 Size: length*width*height _____mm*_____mm*_____mm
3 wind load (max. wind speed) _____kn/m2, _____km/h, _____m/s
4 snow load (max. snow height) _____kn/m2, _____mm
5 anti-earthquake _____level
6 brickwall needed or not If yes, 1.2m high or 1.5m high
7 thermal insulation If yes, EPS, fiberglass wool, rockwool, PU sandwich panels will be suggested; . if not, the metal steel sheets will be ok. The cost of the latter will be much
lower than that of the former
8 door quantity & size _____units, _____(width)mm*_____(height)mm
9 window quanity & size _____units, _____(width)mm*_____(height)mm
10 crane needed or not If yes, _____units, max. lifting weight____tons; max. lifting height _____m


Send your message to this supplier
Send Now

H Beam Pre Engineering Steel Building Steel Structure Industrial Warehouse Construction

Ask Latest Price
Watch Video
Brand Name :
YDX
Model Number :
YDX123
Certification :
ISO,BV.SGS,CE
Place of Origin :
CHINA,QINGDAO
MOQ :
10-10000 square meters
Price :
$30.00-$65.00
Contact Supplier
video
H Beam Pre Engineering Steel Building Steel Structure Industrial Warehouse Construction
H Beam Pre Engineering Steel Building Steel Structure Industrial Warehouse Construction
H Beam Pre Engineering Steel Building Steel Structure Industrial Warehouse Construction
H Beam Pre Engineering Steel Building Steel Structure Industrial Warehouse Construction
H Beam Pre Engineering Steel Building Steel Structure Industrial Warehouse Construction
H Beam Pre Engineering Steel Building Steel Structure Industrial Warehouse Construction
H Beam Pre Engineering Steel Building Steel Structure Industrial Warehouse Construction

Qingdao Yidongxiang Steel Structure Co., Ltd.

Verified Supplier
1 Years
shandong, qingdao
Since 2002
Business Type :
Manufacturer
Total Annual :
1000-2000
Employee Number :
56~100
Certification Level :
Verified Supplier
Contact Supplier
Submit Requirement