Specifications
Payment Terms :
T/T
Self-healing Property :
2mm damage can be automatically closed within 24h
Brand Name :
shhous
Supply Ability :
10000 metric ton
Appearance :
Uniform black paste, no agglomeration, gel or foreign matter
Model Number :
Non-curing rubber asphalt leak-proof coating
Solid Content :
≥98%
MOQ :
1 metric ton
Bond Strength :
≥1.2MPa (to concrete substrate)
Water Impermeability :
No water penetration under 0.3MPa for 30min
Price :
737.7 US dollars per metric ton
Heat Resistance :
No flowing or dripping at 70℃
Certification :
ISO
Low Temperature Flexibility :
No cracks at -20℃
Packaging Details :
in drums
Creep Recovery Rate :
≥95%
Place of Origin :
China Waterproof Industrial Park
Elongation at Break :
≥800%
Description

Non-curing Rubber Asphalt Waterproof Leakage Repair Coating

Main Application Areas:

  • Industrial and Civil Buildings: Roof and side wall waterproofing projects
  • Underground Engineering: Waterproofing for basements, subway stations, and tunnels
  • Special Engineering Projects: Green roofs, road bridges, and railway waterproofing
  • Water Conservancy Facilities: Dams, water tanks, oil tanks, brine tanks, and similar structures
  • Maintenance and Repair Projects: Repair of aging waterproof layers; grouting and sealing of expansion joints and settlement joints
  • Performance Indicator Specific Characteristics
    Non-curing Remains in a viscous gel state even after long-term exposure to air; solid content ≥98%~99.8%
    Strong Self-healing Capability Localized damage to the waterproof layer can be automatically repaired, maintaining the integrity of the waterproof system
    Excellent Creep Resistance High flexibility with elongation ≥800%, capable of accommodating substrate deformation and structural displacement
    Superior Adhesion Performance Can be applied on damp substrates; forms tight bonding with concrete, metal, SBS/APP membranes, and other materials
    High & Low Temperature Resistance Maintains high viscoelastic state within -20℃~70℃ range; retains good adhesion at -20℃
    Anti-water Migration Forms a skin-like waterproof layer that prevents water from migrating within the waterproof system
    Environmentally Safe Solvent-free, no volatile emissions, non-toxic, odorless, and non-flammable
  • Construction Method Description
    Spray Application Mechanical spraying, uniform thickness, high efficiency
    Scrape Application Manual scraping, suitable for detailed nodes
    Grouting for Leakage Repair Used for crack and leakage area repair
  • Typical Construction Process (Composite Waterproofing System)

    1. Substrate Preparation → 2. Non-curing Coating Application → 3. Timely Membrane Laying → 4. Node Reinforcement → 5. Protective Layer Construction
    
    

    Key Construction Points

  • Key Point Requirement
    Substrate Condition Moisture content ≤9%, solid, flat and free of standing water
    Construction Temperature Coating heating temperature: 140~175℃; ambient temperature ≥5℃
    Coating Thickness Pure coating ≥2mm; composite system coating layer ≥1.5~2.5mm
    Membrane Laying Timing Complete membrane laying within 3 minutes after coating application
    Membrane Overlap Treatment Roll 2~3 times with a pressure roller of 50kg or more at the overlap joint
  • Full Paragraph Version (For Product Manuals)

    Construction Methods:

    • Spray Application: Mechanical spraying ensures uniform thickness and high construction efficiency.
    • Scrape Application: Manual scraping is suitable for detailed nodes and complex area treatment.
    • Grouting for Leakage Repair: Used for repairing cracks and existing leakage points in structures.

    Typical Construction Process (Composite Waterproofing System):

    1. Substrate preparation → 2. Non-curing coating application → 3. Membrane laying while the coating is hot → 4. Detail node reinforcement → 5. Protective layer construction

    Key Construction Points:

    • Substrate moisture content should be ≤9%, and the surface must be solid, flat, and free of standing water.
    • Coating heating temperature ranges from 140℃ to 175℃, and construction ambient temperature should be ≥5℃.
    • For single coating application, the thickness should be ≥2mm; for composite systems, the coating layer thickness should be ≥1.5~2.5mm.
    • Waterproof membrane laying must be completed within 3 minutes after coating application to ensure optimal bonding.
    • The overlap joints of waterproof membranes should be rolled 2~3 times with a pressure roller weighing at least 50kg.
  • Non curing Rubber asphalt waterproof coating Leakage Repair for Dams

    Non curing Rubber asphalt waterproof coating Leakage Repair for Dams

Send your message to this supplier
Send Now

Non curing Rubber asphalt waterproof coating Leakage Repair for Dams

Ask Latest Price
Watch Video
Payment Terms :
T/T
Self-healing Property :
2mm damage can be automatically closed within 24h
Brand Name :
shhous
Supply Ability :
10000 metric ton
Appearance :
Uniform black paste, no agglomeration, gel or foreign matter
Model Number :
Non-curing rubber asphalt leak-proof coating
Contact Supplier
video
Non curing Rubber asphalt waterproof coating Leakage Repair for Dams
Non curing Rubber asphalt waterproof coating Leakage Repair for Dams
Non curing Rubber asphalt waterproof coating Leakage Repair for Dams
Non curing Rubber asphalt waterproof coating Leakage Repair for Dams

Weifang Shihua Chemical Building Material Co., Ltd.

Verified Supplier
1 Years
shandong
Since 2000
Business Type :
Manufacturer, Exporter
Total Annual :
17790000-17790000
Employee Number :
150~200
Certification Level :
Verified Supplier
Contact Supplier
Submit Requirement