| Product Name | CNC Milling Parts |
| Material Available | Steel |
| Processing | CNC |
| Tolerance | ±0.002~0.005mm |
| Drawing Accepted | IGES(igs), STEP(stp), SolidWorks (sodprt), PRT, AutoCad, or Samples |
| Inspection | CMM, Projector, Height Gauge, etc. |
| Lead Time | 7~35 working days |
| Quality Assurance | ISO9001:2015, SGS, RoHs |
| Payment Term | MoneyGram, Western Union, T/T, D/P, D/A, L/C |
| Price | According to your drawing or requirements |
| Engineer Support | Available for engineering assistance and drawings design |
| Packaging | Bubble and Carton or Customization |
| Port | Shenzhen |

Applications: Body panels, structural components, brackets, engine parts, interior trim
Special Requirements: Class A surface finishes, high-volume production (500,000+ cycles), quick changeover capabilities
Applications: IC lead frames, connector pins, shielding cans, heat sinks
Special Requirements: Ultra-precision (±0.005mm), progressive dies with 20+ stations, high-speed stamping (800+ SPM)
Applications: Housing components, decorative trim, functional brackets, heat exchanger fins
Special Requirements: Multi-slide actions, textured surfaces, consistent cosmetic appearance
Applications: Surgical instrument parts, implantable device components, diagnostic equipment parts
Special Requirements: Cleanroom manufacturing, validated processes, full traceability, biocompatible materials

RFQ Submission: Provide drawings (PDF/DWG), 3D models (STEP/IGES/SLDPRT), specifications
Technical Review: Engineering assessment, DFM analysis, process planning (24-48 hour response)
Quotation: Detailed pricing with breakdown (material, setup, machining, finishing)
Prototype Phase (if required): Sample production with full inspection report
Production Approval: Process validation, inspection plan agreement
Manufacturing: Scheduled production with milestone updates (weekly/daily)
Final Inspection: Complete FAIR or dimensional report before shipping
Delivery: Appropriate packaging, shipping with tracking, customs documentation
|
Production Type |
Standard Lead Time |
Expedited Options |
Factors Affecting Lead Time |
|
Prototype (1-10 pcs) |
5-15 business days |
3-5 days (+30-50%) |
Material availability, complexity, fixturing |
|
Low Volume (10-100 pcs) |
10-25 business days |
5-10 days (+25-40%) |
Tooling requirements, secondary operations |
|
Medium Volume (100-1,000 pcs) |
3-5 weeks |
2-3 weeks (+20-35%) |
Production scheduling, capacity |
|
High Volume (1,000+ pcs) |
6-12 weeks |
4-8 weeks (+15-30%) |
Material procurement, dedicated production runs |
|
Large Parts (>1m dimension) |
4-10 weeks |
3-6 weeks (+25-50%) |
Special handling, machine availability |