| Product Name | Precision CNC Milling Parts |
|---|---|
| Material Available | Aluminum |
| Processing | CNC |
| Surface Finish | Black Oxidation |
| Tolerance | ±0.002~0.005mm |
| Drawing Accepted | IGES(igs), STEP(stp), SolidWorks (sodprt), PRT, AutoCad, or Samples |
| Inspection | CMM, Projector, Height Gauge, etc. |
| Lead Time | 7~35 working days |
| Quality Assurance | ISO9001:2015, SGS, RoHs |
| Payment Term | MoneyGram, Western Union, T/T, D/P, D/A, L/C |
| Price | According to your drawing or requirements |
| Engineer Support | Available for engineering assistance and drawings design |
| Packaging | Bubble and Carton or Customization |
|---|---|
| Port | Shenzhen |

Face Milling: Large surface area finishing, squaring operations
Peripheral Milling: Slotting, profiling, contour machining
Pocket Milling: Shallow and deep pocketing, cavity creation
Contour Milling: 2D and 3D surface profiling
Drilling/Tapping: Precision hole making, thread creation
Boring: High-precision hole sizing and finishing
Thread Milling: Internal and external thread creation
|
Technique |
Description |
Applications |
Benefits |
|
High-Speed Machining |
High spindle speeds with reduced chip loads |
Aluminum, graphite, plastics |
Reduced cycle times, improved surface finish |
|
Hard Milling |
Machining materials >45 HRC directly |
Tool steels, hardened steels |
Eliminates EDM, better surface integrity |
|
Trochoidal Milling |
Constant engagement circular tool paths |
Deep slots, difficult materials |
Reduced tool wear, higher material removal |
|
Micro-Milling |
Small tools (<1mm diameter) |
Medical devices, micro-optics, electronics |
Precision small features, fine details |
|
5-Axis Simultaneous |
Continuous tool orientation control |
Turbine blades, impellers, complex geometries |
Single setup completion, complex contours |
Tool Materials: Carbide (various grades), CBN, PCD, diamond-coated, HSS
Tool Holding Systems: HSK, BT, CAT with hydraulic, thermal, or mechanical clamping
Cutting Tool Types: End mills (flat, ball, corner radius), face mills, slot cutters, drills, taps
Coolant Systems: High-pressure through-spindle (70-200 bar), minimum quantity lubrication, cryogenic options
Tool Management: Presetters, in-machine probing, automatic tool changers (30-200+ tools)
|
Operation |
Equipment/Process |
Capability |
Typical Tolerances |
|
CNC Turning |
Live tooling on mills, separate lathes |
Turning features on milled parts |
±0.01mm |
|
Grinding |
Surface, cylindrical, jig grinders |
Precision flatness, parallelism, size |
±0.002mm |
|
EDM |
Wire and sinker EDM |
Complex geometries, hard materials |
±0.005mm |
|
Heat Treatment |
Vacuum furnaces, atmosphere controlled |
Hardening, tempering, stress relief |
Material dependent |
|
Welding |
TIG, laser, electron beam |
Component assembly, repair |
±0.05mm after weld |
|
Assembly |
Press fits, adhesive, fastening |
Multi-component assemblies |
As per drawing |
|
Finish Type |
Process Method |
Surface Ra (μm) |
Characteristics & Applications |
|
As-Machined |
Standard CNC milling |
0.8-3.2 |
Cost-effective, visible tool marks, general applications |
|
Bead Blasting |
Glass bead, aluminum oxide |
0.8-1.6 |
Matte finish, uniform appearance, stress relief |
|
Polishing |
Mechanical, chemical, electro |
0.025-0.4 |
Reflective, smooth, food, medical, optical |
|
Anodizing |
Type I-III, hardcoat (Al) |
Base material dependent |
Decorative, corrosion resistant, wear resistant |
|
Plating |
Nickel, chrome, zinc, tin |
Varies |
Corrosion protection, appearance, solderability |
|
Powder Coating |
Electrostatic application |
N/A (coating) |
Durable, color options, corrosion protection |
|
Passivation |
Nitric or citric acid (SS) |
Base material finish |
Corrosion resistance restoration |
|
Laser Marking |
Fiber, YAG lasers |
N/A (marking) |
Permanent identification, serialization, logos |
|
Tumbling/Vibratory |
Media finishing |
0.4-1.6 |
Deburring, edge breaking, surface smoothing |

| Production Type | Standard Lead Time | Expedited Options | Factors Affecting Lead Time |
|---|---|---|---|
| Prototype (1-10 pcs) | 5-15 business days | 3-5 days (+30-50%) | Material availability, complexity, fixturing |
| Low Volume (10-100 pcs) | 10-25 business days | 5-10 days (+25-40%) | Tooling requirements, secondary operations |
| Medium Volume (100-1,000 pcs) | 3-5 weeks | 2-3 weeks (+20-35%) | Production scheduling, capacity |
| High Volume (1,000+ pcs) | 6-12 weeks | 4-8 weeks (+15-30%) | Material procurement, dedicated production runs |
| Large Parts (>1m dimension) | 4-10 weeks | 3-6 weeks (+25-50%) | Special handling, machine availability |