

DIN RAIL TYPE KWH ENERGY METER
Application:
Model XTM1250SA three phase four wire electronic DIN rail active energy meter is a kind of new style three phase four wire active energy meter, it adopt micro-electronics technique, and imported large scale integrate circuit, use advanced technique of digital and SMT techniques, etc. The meter completely accord with relevant technical requirements of class 1 three phase active energy meter stipulated in international standard IEC 62053-21.
It can accurate and directly measure 50Hz or 60Hz active energy consumption from three phase four wire AC electricity net. This meter has seven digits LCD displays shows the active energy consumption. Contact with all kind of AMR system conveniently It has following features: good reliability, small volume, light weight, specious nice appearance, convenient installation, etc.
This meter has already got the patent certificate from China State Intellectual Property Office at present. Patent certificate NO. 2012 3 0473416.7, any other country patent certificate are in assessing.
Functions and features:
| Technical parameters | |||||
| Model | Accuracy | Reference Voltage(V) | Current specifications(A) | Starting current(A) | Insulation performance |
| XTM1250SA | Class A | 3×127/220 3×230/400 | 5A/CT,10(50)A, 10(100),5(100)A | 0.01 | AC voltage 4kv for 1 minute, 1.2/50us waveform impulse voltage 6kv |
Dimensions and installation dimensions:


DIN RAIL TYPE KWH ENERGY METER SHOWN:










Further information:
1. Plastics materials: all raw materials are brand-new and second-hand materials are forbidden. Furthermore some of them are supplied by super branding companies like DSM, Mitsubishi.
2. There is just one level of quality as A in MEIHENG and we are aim to provide the excellent articles to our clients and help them gain more market shares.
3. ODM: we are providing ODM services to the super companies (more than 15) who are top-10 electrical industrial companies in their country. Just show us your ideas and we will present a solution.
FAQ
A. How's the delivery time?
Depend on your quantity, usually within 20days after receiving deposit
B. Would you accept OEM/ODM service?
Glad to say that there is planning department, technical department and mould tooling center in
our factory. For the OEM & ODM, it is ok for us if your brand, market shares are great.