Specifications
Brand Name :
Greentech
Model Number :
3524
Certification :
SGS
Place of Origin :
Tianjin,China
MOQ :
500kg
Price :
$2.6-5.8/kg
Supply Ability :
1000 tons per month
Packaging Details :
20kg/carton
Raw Material :
Epoxy Polyester Hybird resin
Color :
Ral color
usage :
indoor
Gel time :
250±50
Application Method :
Electrostatic spray
Gloss :
high/Low/Matt
Description

electrostatic epoxy polyester resin powder coating

Feature:

  1. Excellent adhesion, flexibility, impact resistance, high hardness. Good flow property, vividness, fullness, saturation, beautiful decoration.
  2. To improve the reaction rate of the material, to enhance the effect of seculars reflection, light saturation capacity. Reflection effect, decorative effect is improved.
  3. The protection of pigment is much better.
  4. Giving coating more functional elements according to the different requirement, such as waterproof and rust-proof.
  5. Make the powder coating easy to reach grooves, corner.
  6. Powder rate is high, the coating with high efficiency, spraying area is large, the cost is lower than the paint coating.
  7. Environmental protection, excluding volatile matter, no smell of paint, do not contain heavy metals and polybrominated biphenyl (certification testing by SGS), in line with the international general standards, without any toxic and side effects

Item Test standard and method Test
Appearance Color uniform, loose without blocking, dry coating liquidity 120—140mm visual
color As customer required Chromatic meter
Adhesion GB/T9286-1998 ISO2409 0 class
Impact resistance GB/T1732-1993 ISO6272 50kg.cm
flexibility GB/6742-1986 ISO1519 3mm
Cupping test GB/T9753-1993 ISO1520 8mm
Pencil hardness GB/T6739-1996 ASTM/D3363 1H-2H
Salt spray testing GB/T1771-1991 ISO7253 > 500hour
Heat resistance 150℃/24 hours(white) <0.5
Humid and hot resistance GB/T1740-1979 ISO6270 >1000hous

Application areas: air conditioning, refrigerator, microwave ovens, cooking hoods electric kettles and other household appliances shell

Send your message to this supplier
Send Now

Interior / Patio Furniture Powder Coating 250±50 Gel Time Impact Resistant

Ask Latest Price
Brand Name :
Greentech
Model Number :
3524
Certification :
SGS
Place of Origin :
Tianjin,China
MOQ :
500kg
Price :
$2.6-5.8/kg
Contact Supplier
Interior / Patio Furniture Powder Coating 250±50 Gel Time Impact Resistant
Interior / Patio Furniture Powder Coating 250±50 Gel Time Impact Resistant

Greentech (Tianjin) Anti-corrosion Engineering Tech Co.,Ltd

Active Member
9 Years
tianjin, tianjin
Since 2011
Business Type :
Manufacturer, Exporter
Total Annual :
1.8million-3.6million
Employee Number :
120~150
Certification Level :
Active Member
Contact Supplier
Submit Requirement