Pipe Winding Single-Head Machine 32 63 75 For PE Pipe Making Industry
1,Machine features:
Pipe Winding Machine Parameters | |||
Model | QP32 | QP63 | QP75 |
Inner diameter | 340-800 MM | 320-1500 MM | 1000-2200 MM |
Max Winding Outer Diameter (mm) | 1200 | 1800 | 2400 |
Winding Width (mm) | 300-400/400-500 | 300-400/400-500 | 400-500/500-600 |
Max Winding Pipe (mm) | 16-32 | 20-63 | 75-110 |
Power Torque Motor | 10NM | 25NM | 40NM |
Rolling Ring Drive | GP30 | GP40 | GP40 |
Slowing Speed Machine | WPA80 | WPA120 | WPA120 |
Rewinding Claw(number) | 6 | 6 | 6 |
Single-Station/Head | 1.9*1.5*1.5 M(200KG) | 2.4*1.4*2.2 M | 4*2.8*2.8 M |
Double-Station | 2.8*1.6*2 M (300KG) Same direction | 2.4*2.2*2.2 M Indirectional | 6*2.8*2.8 Indirectional |
Business Scope:
Our company mainly products roller guides ,rolling ring drives ,wire take up machine, wire coil winding machine ,pipe winding machine, automatic coiling and packaging machine, microcomputer automatic rolled plate machine ,wire straightener , wire straightening and cutting machine, etc. (Some as follow picture show)
After-sales service:
After the sale, the machine is guaranteed for one year under the premise of reasonable use of the customer. Maintain work at home and maintain response time of no more than 24 hours. Free maintenance during the warranty period, and the equipment maintenance service beyond the warranty period is subject to clear charges.
Company Profile:
The company’s production has evolved from the production of single-ring rolling mills and steel wire roller devices to large-scale machinery such as cable winding machines, coil winding machines, small spool winding machines, textile yarn winding machines, and microcomputer coil winding Line packaging machine etc. This series is equipped with advanced production equipment, and the company has become a well-known professional equipment manufacturer in the industry.
FAQ:
Q1. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and
packages before you pay the balance.
Q2. What are your terms of delivery?
A: EXW, FOB, CFR, CIF.
Q3. How about your delivery time?
A: Generally, it will take 10 to 15 days after receiving your advance payment. The specific delivery timedepends on the items and the quantity of your order.
Q4. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery.
Q5. Can you do trail production ?
A:Yes, we can do trial with customer's product.
Technical support
We have prafessional technical team in designing,producing.
Technical support is available during your daily using and maintainance.
Read more: