Specifications
Resistance Tolerance :
±20%
Pitch :
5mm
Voltage-Supply(Max) :
270V
Resistance @ 25℃ :
100Ω
Description :
PTC Thermistor 100Ω Through Hole P=5mm
Mfr. Part # :
MZ21-P101RMGBF1E2S
Model Number :
MZ21-P101RMGBF1E2S
Package :
Through Hole,P=5mm
Description

Product Overview

The MZ21 Type PTC Thermistor is designed for overcurrent protection in telecommunication and AC circuits. Its compact structure makes it suitable for these applications.

Product Attributes

  • Brand: MZ21
  • Origin: Nanjing Nanshan Semiconductor Co., Ltd.
  • Type: PTC Thermistor

Technical Specifications

Part NumberSpecificationRated Resistance (251)Switch Temperature (10)Max. VoltageNon-operating Current (25)Typical Trip Current (25)Operating Ambient Temperature RangeChip DiameterLead StyleLead SpacingWire DiameterLead Type
MZ21-P101RMGBF1E2SPTC THERMISTOR100 20%120 270 Vac50 mA125 mA-40~+857 mmInside Kink5.0 mm0.6 mmLong Lead

2410121320_FH-MZ21-P101RMGBF1E2S_C20624336.pdf

Send your message to this supplier
Send Now

Durable Overcurrent Protection Thermistor FH MZ21-P101RMGBF1E2S with Long Lead and Inside Kink Style

Ask Latest Price
Resistance Tolerance :
±20%
Pitch :
5mm
Voltage-Supply(Max) :
270V
Resistance @ 25℃ :
100Ω
Description :
PTC Thermistor 100Ω Through Hole P=5mm
Mfr. Part # :
MZ21-P101RMGBF1E2S
Contact Supplier
Durable Overcurrent Protection Thermistor FH MZ21-P101RMGBF1E2S with Long Lead and Inside Kink Style

Changsha Purple Horn E-Commerce Co., Ltd.

Verified Supplier
1 Years
hunan, changsha
Since 2009
Business Type :
Manufacturer, Distributor/Wholesaler, Agent, Importer
Employee Number :
300~500
Certification Level :
Verified Supplier
Contact Supplier
Submit Requirement