Designed specifically for palletizing applications, the Palletizer Series features five unique robots with payload capacity from 80 kg to 500 kg to suit most needs. With industry leading work range and reliability, Kawasaki's high-speed palletizing robots help companies improve production line efficiency.
RD80N has a turning radius of 397 mm, enabling it to cover a wide working area at high speed while occupying less space than a person. The MD500N features a unique new-type link mechanism for the upper and lower arms, allowing for a compact body without a counter weight.
Cubic-S, an optional function to monitor robot movements, can be used to limit the range of robot movements and make safety fence area smaller.
The RD80N is the most compact model but possesses a wide range of movements. The RD80N stacks a maximum height of 2062.3 mm on 1100*1100 pallets.
Kawasaki palletizing robots deliver the high-speed operation needed for distribution. When moving a vertical distance of 400mm and horizontal distance of 2000 mm in to-and-fro motion:
| Degrees of Freedom | 4 axis | |
|---|---|---|
| Payload | 180 kg | |
| Work Envelope & Maximum Speed | ||
| Axis | Motion Range | Maximum Speed |
| JT1 | ±160° | 140°/s ✽4 |
| JT2 | +95° - -46° | 125°/s ✽4 |
| JT3 | +15° - -110° | 130°/s ✽4 |
| JT4 | ±360° | 400°/s ✽4 |
| JT5 | - | - |
| Working Area |
Width: 1,800 mm Depth: 1,600 mm Height: 2,200 mm |
|
| Moment of Inertia | 50 kg•m² ✽4 | |
| Palletizing Capacity | 2,050 cycles/hour ✽4 | |
| Positional Repeatability | ±0.5 | |
| Mass | 1600 kg | |
| Power Requirements | 12 KVA ✽3 | |
Machine film wrapped and packed in exported fumigation wooden box, then transported to departure port as required (Shanghai, Ningbo, Qingdao, Suzhou, etc.).
We provide accurate factory layout design according to customer's factory size, including workshop design with electric power, water supply, gas power, material storage, final storages, and workers' restroom.
Commissioning service includes 1-2 engineers for installation and adjustment to achieve normal production quickly. Our engineers train workers on operation, cleaning, maintenance, and repair until they can operate the production line independently.
Standard commissioning service takes 10 days with 1-year guarantee from completion date. Engineer's round-trip flight tickets, accommodation, and daily salary (USD 60-100) are client's responsibility.
To receive detailed pricing, please provide the following project requirements for optimal machine selection: