The FRO-CDual-1000 represents a breakthrough in scalable water treatment architecture, delivering 1,000 m³/day (264,000 GPD) of high-quality permeate through two interconnected 40ft ISO container modules operating in parallel configuration. This twin-module design fundamentally reimagines large-capacity containerized water treatment by providing inherent N+1 redundancy, enabling individual module isolation for maintenance without interrupting water production, and offering a clear path for incremental capacity expansion without the capital intensity of single large-scale plants.
| Parameter | Specification |
|---|---|
| Model | FRO-CDual-1000 |
| Total Permeate Flow (Both Modules) | 1,000 m³/day (41.7 m³/h, 264,000 GPD) |
| Per Module Permeate Flow | 500 m³/day (20.8 m³/h, 132,000 GPD) |
| Recovery Rate (per Module) | 75% Standard / 80% Max |
| Feed Water TDS | ≤ 3,500 ppm |
| Nominal Salt Rejection | ≥ 99.0% |
| Total Membranes | 84 * DOW BW30-8040 (42 per Module) |
| Operating Pressure | 10~16 bar (per Module) |
| Power per Module | 95 kW (380V/50Hz) |
| Total Installed Power | 190 kW (100% Load, Both Modules) |
| Container per Module | 40ft High Cube ISO, CSC Certified |
| Operating Weight per Module | Approx. 16,000 kg |
| Interconnection Piping | DN150 SS304 Feed/Permeate/Concentrate Common Headers |
| Module Isolation Valves | DN150 Pneumatic Butterfly, Fail-Closed |
| Control Architecture | Distributed: 2 * S7-1200 + 1 * Central Master SCADA HMI |
| Remote Access | 4G VPN Router per Module + Central Ethernet Switch |
The FRO-CDual-1000 is purpose-designed for water treatment applications where reliability, scalability, and operational continuity are equally critical. Primary deployment scenarios include municipal water supply systems serving cities with populations of 30,000 to 60,000, regional desalination plants, mining and mineral processing operations, large-scale food and beverage manufacturing facilities, and power generation plants. The modular architecture provides significant advantages for project financing, allowing capital expenditure to be phased across the commissioning timeline without sacrificing initial production capacity.
Each FRO-CDual-1000 twin-module system undergoes sequential factory acceptance testing including individual module wet testing at 500 m³/day for 48 hours, followed by integrated system testing with both modules operating in parallel for an additional 24 hours. Both containers ship as standard ISO units with full CSC certification. The comprehensive documentation package includes system-level P&ID, electrical single-line diagrams, O&M manuals, integrated system commissioning procedures, and recommended spare parts inventory. Optional services include on-site installation supervision, integrated system commissioning, operator training programs, and long-term service agreements.