Specifications
Original :
China
Payment Terms :
T/T,Western Union
Power Supply :
380V 3pH 50Hz
Input Power :
6.44kw
Brand Name :
RFJ
Certification :
CC
Place of Origin :
China
MOQ :
1piece
Price :
discussed
Supply Ability :
10000pieces
Delivery Time :
3-7 days
Packaging Details :
wooden packaging
Color :
Blue
Cooling Capacity :
15.61kw
Model Number :
SPB03KL
Tyoe :
condensing unit
OEM service :
Yes
Description
Unit - SPB03KL Air Cooled Condensing Unit for Model 2CES-3Y-40S
Air Cooled Compressor Condensing Unit - SPB03KL
  • Fan Speed Regulator: Adjusts condensing fan according to condensing temperature
  • Operation Data Display Function: Monitors important data including compressor current and condensing temperature
  • System Alarm Function: Audible alarm activates when system faults occur to alert users
  • Independent Operation Board:
    • Displays temperature, controls defrosting, checks operation system data, and provides temperature alarms
    • Flexible installation options - can be mounted anywhere convenient
Product Images
Unit - Spb03kl  Air Cooled Condensing Unit for Model 2CES-3Y-40S Unit - Spb03kl  Air Cooled Condensing Unit for Model 2CES-3Y-40S
Technical Specifications - Installation Dimensions
Condensing Unit Model Compressor Model Length L(A) mm Width W(B) mm Height H(C) mm
SPB03KL2CES-3Y780680700
SPB04KL4EES-4Y780680700
SPB05KL4DES-5Y880760800
SPB06KL4CES-6Y880760800
SPB09KL4TES-9Y1130760700
SPB12KL4PES-12Y1130760700
SPB14KL4NES-14Y1130760800
SPB18KL4HE-18Y1340860760
SPB23KL4GE-23Y1490860960
SPB28KL6HE-28Y1590860960
SPB34KL6GE-34Y15908601360
SPB44KL6FE-44Y1190360860
Frequently Asked Questions
Why we choose such big compressor horsepower?
Fresh food contains significant heat and requires substantial compressor horsepower to cool down within 4-6 hours effectively.
Why the temperature is so low?
Fresh food needs to reach -20°C within 4-6 hours, which requires cold room temperatures of -35°C or -40°C to achieve this rapid cooling.
Why does the blast cold room need to use the vertical air cooler?
Vertical air coolers feature large fin spacing, substantial air flow capacity, and are very easy to install, making them ideal for blast freezing applications.
Can the blast freezer cooling time be shorter?
4-6 hours provides optimal cooling speed while remaining economical. Reducing to 2-3 hours would require even larger horsepower compressors and significantly higher costs.
Send your message to this supplier
Send Now

Unit - Spb03kl Air Cooled Condensing Unit for Model 2CES-3Y-40S

Ask Latest Price
Original :
China
Payment Terms :
T/T,Western Union
Power Supply :
380V 3pH 50Hz
Input Power :
6.44kw
Brand Name :
RFJ
Certification :
CC
Contact Supplier
Unit - Spb03kl  Air Cooled Condensing Unit for Model 2CES-3Y-40S
Unit - Spb03kl  Air Cooled Condensing Unit for Model 2CES-3Y-40S

Shenzhen Ruifujie Technology Co., Ltd.

Verified Supplier
12 Years
guangdong, shenzhen
Since 2006
Business Type :
Manufacturer, Distributor/Wholesaler, Exporter
Total Annual :
44000000-60000000
Employee Number :
110~115
Certification Level :
Verified Supplier
Contact Supplier
Submit Requirement