Specifications
Brand Name :
RFJ
Certification :
CC
Place of Origin :
China
MOQ :
1piece
Price :
discussed
Supply Ability :
10000pieces
Delivery Time :
3-7 days
Packaging Details :
wooden packaging
OEM service :
Yes
Payment Terms :
T/T,Western Union
Tyoe :
condensing unit
Original :
China
Condenser :
Copper pipe
Power Supply :
380V 3pH 50Hz
Model Number :
4CES-6Y-40S,4CC-6.2Y-40S
Color :
Blue
Cooling type :
Air cooled
Description
Unit-SPB06KL Air Cooled Condenser Compressor Condensing for Model 4CES-6Y-40S 4CC-6.2Y-40S
Product Overview

Air Cooled Compressor Condensing Unit-SPB06KL for model 4CES-6Y-40S 4CC-6.2Y-40S

Key Features
  • Independent Operation Board: For temperature display, defrost control, system data monitoring, and temperature alarm functions
  • Operation Data Display: Monitor critical data including compressor current and condensing temperature
  • Fan Speed Regulation: Automatically adjusts condensing fan speed based on condensing temperature
  • System Alarm Function: Audible alarm alerts users when system faults occur
Product Images
Unit-SPB06KL Air Cooled Condenser Compressor Condensing for Model 4CES-6Y-40S 4CC-6.2Y-40S Unit-SPB06KL Air Cooled Condenser Compressor Condensing for Model 4CES-6Y-40S 4CC-6.2Y-40S
Technical Specifications
Installation Dimensions for Air-Cooled Compressor Condensing Units
Condensing Unit Model Compressor Model Length L(A) mm Width W(B) mm Height H(C) mm
SPB03KL 2CES-3Y 780 680 700
SPB04KL 4EES-4Y 780 680 700
SPB05KL 4DES-5Y 880 760 800
SPB06KL 4CES-6Y 880 760 800
SPB09KL 4TES-9Y 1130 760 700
SPB12KL 4PES-12Y 1130 760 700
SPB14KL 4NES-14Y 1130 760 800
SPB18KL 4HE-18Y 1340 860 760
SPB23KL 4GE-23Y 1490 860 960
SPB28KL 6HE-28Y 1590 860 960
SPB34KL 6GE-34Y 1590 860 1360
SPB44KL 6FE-44Y 1190 360 860
Frequently Asked Questions
Can the blast freezer cooling time be shorter?
4-6 hours is fast enough and very economical. Achieving 2-3 hours would require a larger horsepower compressor and increased costs.
Why do we choose such large compressor horsepower?
Fresh food contains significant heat and requires substantial compressor horsepower to cool down effectively within 4-6 hours.
Why is the temperature so low?
Fresh food needs to reach -20°C within 4-6 hours, which requires a cold room temperature of -35°C or -40°C to achieve this rapid cooling.
Why does the blast cold room need to use the vertical air cooler?
Vertical air coolers feature wide fin spacing, high air flow capacity, and are very easy to install, making them ideal for blast cooling applications.
Send your message to this supplier
Send Now

Unit-SPB06KL Air Cooled Condenser Compressor Condensing for Model 4CES-6Y-40S 4CC-6.2Y-40S

Ask Latest Price
Brand Name :
RFJ
Certification :
CC
Place of Origin :
China
MOQ :
1piece
Price :
discussed
Supply Ability :
10000pieces
Contact Supplier
Unit-SPB06KL Air Cooled Condenser Compressor Condensing for Model 4CES-6Y-40S 4CC-6.2Y-40S
Unit-SPB06KL Air Cooled Condenser Compressor Condensing for Model 4CES-6Y-40S 4CC-6.2Y-40S

Shenzhen Ruifujie Technology Co., Ltd.

Verified Supplier
12 Years
guangdong, shenzhen
Since 2006
Business Type :
Manufacturer, Distributor/Wholesaler, Exporter
Total Annual :
44000000-60000000
Employee Number :
110~115
Certification Level :
Verified Supplier
Contact Supplier
Submit Requirement