Test system Comprehensive Test System for ATE Tester, LED Power Supply Aging Cabinet Detection Equipment
The main functions of the ATE testing system include the following aspects:
-
Automated Testing:
- The ATE testing system is capable of automatically executing test procedures without the need for human intervention, thereby significantly improving testing efficiency.
- Automated testing simplifies complex testing procedures, automatically collects and stores test data, enhances testing efficiency and accuracy, and frees up manpower.
-
Support for Various Test Contents:
- The ATE testing system supports multiple types of tests, such as functional testing, reliability testing, timing testing, electrical property testing, and more.
- The system can simulate a variety of test environments to ensure the quality and stability of products.
-
Batch Testing:
- The ATE automatic test equipment supports batch testing, which can meet the mass testing needs of enterprises.
- Through batch testing, enterprises can quickly screen out nonconforming products and improve production efficiency.
-
Data Analysis and Reporting:
- The ATE testing system will automatically record and analyze test data, and generate detailed data reports.
- These reports help enterprises understand product quality conditions, conduct quality improvement, and make decisions.
-
Fault Detection and Early Warning:
- The ATE testing system is able to monitor the working status of the tested products in real time. Once an abnormality or fault is detected, it can promptly issue a warning and stop the test, avoiding damage to the products.
-
Flexibility and Scalability:
- The ATE testing system usually has a flexible architecture and scalable functions, and can be customized and expanded according to the specific needs of enterprises.
-
Compatibility and Universality:
- The ATE testing system typically has good compatibility and can support multiple types of test instrument models and interface types.
- This provides enterprises with more options and reduces testing costs.
Test Items of Top-Smart 1100 Mobile Power Supply Testing System:
| Input test | Charge test |
| Input voltage ramp | Charge current test |
| Input freq. ramp | Full charge testing |
| AC cycle drop out | slow charge test |
| Input power supply distortion mode | Slow Charge ID setting test |
| Input RMS current | Discharge while charge test |
| input power | Electricity indication test |
| Input power factor | Simulation battery function |
| Input peak current test | Wireless charging test |
| Output test | Timing / dynamic test |
| DC output voltage | Turn ON time |
| DC output current | Rise time |
| Power up sequence | Fall time |
| Power off sequence | Hold-up time |
| Tracking | Special test |
| Efficiency test | LED lamp voltage and status test |
| Overshoot voltage test | LED flashing frequency test |
| Peak-Peak noise | Sleep mode test |
| Stability test | D + / D-voltage test |
| Voltage regulation | MCU communication and calibration tests |
| Current regulation | Discharge test |
| Mixed effect test | GPIB read/write |
| Protection test | USB read/write |
| Short circuit test | RS232 read / write |
| OV protection | TTL signal control |
| UV protection | Relay control |
| Charge protection test | Bar code scan |
| Discharge protection test | Extended measurement function |
| Overcurrent protection test | |
| Fast charge test(Applicable to QC2.0, QC3.0 and other fast charge test) | |