Large Diameter HDPE PP Water Supply ,Gas Supply and Chemical Pipe Extrusion Line Plastic Pipe Making Machine
Description:
The Large diameter PE PP pipe production line is developed by Jwell. It is suitable for producing water supply and water drainage big diameter pipes. It adpots European advanced technology and combines 23 years R&D experience of the plastic pipe machinery which could achieve high speed, stable production and energy saving.
Machine features:
Machine specification:
No. | Machine model | Extruder | Main motor power(kw) | Pipe diameter (mm) | Capacity (kg/h) | Remarks |
1 | MFH-PE32S | MFH60/38 | 110 | 20-32 | 400-450 | Double pipes |
2 | MFH-PE63 | MFH60/38 | 90 | 20-63 | 300-360 | |
3 | MFH-PE63S | MFH75/38 | 160 | 20-63 | 500-600 | Double pipes |
4 | MFH-PE110 | MFH60/38 | 110 | 20-110 | 400-450 | |
5 | MFH-PE160 | MFH60/38 | 110 | 50-160 | 400-450 | |
6 | MFH-PE250 | MFH75/38 | 132 | 75-250 | 450-550 | |
7 | MFH-PE315 | MFH75/38 | 160 | 110-315 | 500-600 | |
8 | MFH-PE500 | MFH90/38 | 200 | 200-500 | 650-750 | |
9 | MFH-PE630 | MFH90/38 | 250 | 315-630 | 900-1000 | |
10 | MFH-PE800 | MFH120/38 | 315 | 400-800 | 1000-1200 | |
11 | MFH-PE1000 | MFH120/38 | 355 | 500-1000 | 1200-1400 | |
12 | MFH-PE1200 | MFH150/38 | 400 | 630-1200 | 1200-1500 |
Pipe application:
Pipe connection methods:
Produciton:
Shipping and package:
After-sale service:
After sale service team
1. The guarantee period is 1 year and service is available lifelong. The cost of broken components will be covered by the buyer, but during guarantee period, the cost of broken components will be covered by the seller, except the easy broken parts and damaged parts by human reasons.
2.Our expert will answer any inquiry within 24-48 hours and it will be solved as soon as possible
3.Buyer can send engineers to our JWELL company for training
4.We supplies the complete technical documents and the relative drawings of the electric components in Chinese and English
5.We will send enough technicians to the Buyer’s company for installation and commissioning of machines.The cost caused by the seller’s technicians in customer’s country (including shuttle trip ticket between China and the Buyer’s country , inland traffic, medical fees, lodging, dinner and so on) will be covered by buyer