PE Insulation Pipe Extrusion Line
Description:
PE insulation pipe is also called PE outer protection pipe, jacket pipe, sleeve pipe. The direct buried polyurethane insulation pipe is made of HDPE insulation pipe as the outer protective layer, the middle filled polyurethane rigid foam is used as the insulation material layer, and the inner layer is steel pipe. Polyurethane direct buried insulation pipe has good mechanical properties and thermal insulation performance. Under normal circumstances, it can withstand high temperature of 120-180 °C, and is suitable for various cold and hot water high and low temperature pipeline insulation projects. The insulation pipe production line is designed with a special PE insulation pipe mold, the extrusion pressure is stable, and the thickness of the thin-walled pipe is uniform. The extrusion speed is fast, the output of the blown type is greatly improved, the surface is brighter, and the operation automation is high.
Machine features:
Machine specification:
No. | Machine model | Extruder | Pipe diameter (mm) | L x W x H(m) | Total power(KW) |
1 | MFH-PE630B | MFH75/38 MFH90/33 | 200-630 | 30x3x4 | 290 |
2 | MFH-PE1000B | MFH90/38 MFH90/33 | 315-960 | 34x3x4
| 342 |
3 | MFH-PE1400B | MFH120/38 MFH120/33 | 760-1380 | 40x3.5x4.3
| 472 |
4 | MFH-PE1700B | MFH120/38 MFH150/33 | 1054-1680 | 40x3.5x4.3
| 512 |
5 | MFH-PE2000B | MFH120/38 MFH150/33 | 1054-1960 | 49x4.5x5
| 670 |
Pipe application:
Production:
Shipping and package:
After-sale service:
1. The guarantee period is 1 year and service is available lifelong. The cost of broken components will be covered by the buyer, but during guarantee period, the cost of broken components will be covered by the seller, except the easy broken parts and damaged parts by human reasons.
2.Our expert will answer any inquiry within 24-48 hours and it will be solved as soon as possible
3.Buyer can send engineers to our JWELL company for training
4.We supplies the complete technical documents and the relative drawings of the electric components in Chinese and English
5.We will send enough technicians to the Buyer’s company for installation and commissioning of machines.The cost caused by the seller’s technicians in customer’s country (including shuttle trip ticket between China and the Buyer’s country , inland traffic, medical fees, lodging, dinner and so on) will be covered by buyer