Base treatment: Ensure the wall surface is flat, firm, and dry (moisture content ≤10%). Remove mold, oil stains, and loose materials. For old walls, it is recommended to sand and clean off the dust.
Construction environment:
Temperature 5℃-35℃, air humidity ≤85%, avoid construction in rainy, snowy or windy weather.
Paint preparation:
After opening the can, stir well. You can add an appropriate amount of water to dilute it as needed (it is recommended to add no more than 20% water). After stirring well, let it stand for 5 minutes.
Construction method:
• Application: It is recommended to apply one coat of alkali-resistant primer first, followed by two coats of this product (with an interval of ≥4 hours).
• Roller/Spray: Apply evenly, avoiding missed spots or excessive thickness in some areas.
• Consumption: Approximately 10-12㎡/kg/single coat (actual amount varies depending on substrate condition and application method)
Drying time:
Surface dry in 30 minutes, re-coat every 4 hours, fully cured in 7 days.