Specifications
Brand Name :
Hebi Pantu
Model Number :
BOP Control Flexible Hose
Certification :
API 16D
Place of Origin :
China
MOQ :
1 set 10m length
Price :
USD 450 per set
Payment Terms :
T/T
Supply Ability :
50 sets per 1 month
Delivery Time :
7 work days
Packaging Details :
Iron Case
Name :
BOP Control Flexible Hose
Type :
Braided
Thread :
NPT LP
Inner Dia :
25mm 32.5mm
Applicable Standard :
API Spec 16D SY/T5053.2-2002
Application :
Blow Out Prevention Systems
Description

25mm 32.5mm BOP Control Flexible Hose In Blow Out Prevention Systems

BOP Control Flexible Hose (BOP hydraulic control lines) used for blow-out prevention systems are manufactured with superior components to operate and withstand tough crisis oilfield conditions. These BOP Control Flexible Hoses are designed to hold full working pressure and allow continued operation of the BOP control systems even in the harshest of fires.

BOP Control Flexible Hose Specification

Nominal Outerdia.of Operating Min.burst Min.bending Thread Operatingtime(min)with
Normal Limit
19 44 35 105 280 NPT
LP
5 25
50 70 175
22 47 35 105 320
53 70 175
25 50 35 105 360
56 70 175
31.5 56 35 105 460
62 70 175
38 63 35 105 560
69 70 175

Our Advantage:

1). Special packing is available according to customers' requirements.

2). ISO 14000 / ISO 9000 / Quality certificate

3). Strict quality inspection, Strong R&D team

4). Environmental friendly without pollution

5). Many years of manufacturing experience, strong and experienced export team

Send your message to this supplier
Send Now

25mm BOP Control Flexible Hose

Ask Latest Price
Brand Name :
Hebi Pantu
Model Number :
BOP Control Flexible Hose
Certification :
API 16D
Place of Origin :
China
MOQ :
1 set 10m length
Price :
USD 450 per set
Contact Supplier
25mm BOP Control Flexible Hose

Hebei Pantu Machinery Equipment Co., Ltd

Active Member
3 Years
hebei, cangzhou
Since 2021
Business Type :
Manufacturer, Trading Company
Total Annual :
1000-1500
Employee Number :
80~100
Certification Level :
Active Member
Contact Supplier
Submit Requirement