Manufacturer Profile
Direct Steel Pole Factory: Yixing Hongxin Illumination Facilities Co., Ltd.
- Over 25 years of manufacturing experience
- 30 million RMB registered capital
- 15,000 square meter facility
- Advanced machinery and equipment
- Experienced engineers and skilled workers
- Specialized in hot dip galvanizing steel poles
- Production capacity over 1,000 tons per month
Material Specifications
Raw material conforms to GB/T1591-2008 standards with options including Q255, Q355, Q420, and Q460 steel grades.
| China GB |
America ASTM |
Equivalent |
| Q255 |
Grade D |
SS400, S235JO |
| Q355 |
Grade50[345] |
S355JR |
| Q420 |
Grade60[415] |
S420NL |
| Q460 |
Grade65[450] |
S460NL |
Manufacturing Process
Our factory utilizes advanced production equipment including bending calibration machines, hydraulic plate shearing machines, cutting machines, slitting machines, gas welding machines, and hydraulic straighteners to ensure superior quality steel poles.
Finished Products
Traffic Sign and Traffic Lights Combined Multifunctional Steel Poles
Quality Inspection
Professional engineers conduct comprehensive inspections throughout the manufacturing process and before delivery. Our quality control includes:
- Laboratory testing
- Workload testing
- Steel thickness verification
- Galvanization thickness measurement
Delivery Information
We typically ship using 40HQ containers with a port limit weight of 26 tons per container.
Frequently Asked Questions
Are you a manufacturer or a trading company?
We are both the direct factory manufacturer and a trading company.
Where is your company located?
Our factory is located at Yinhe Road No.3, Wanshi town, Jiangsu, China (mainland).
What are your main products?
Our main products include electric poles, street lighting poles, high mast poles, telecommunication tower poles, traffic signal poles, and wind generation poles.
What's your nearest port?
Shanghai Port is our nearest port.
What's your payment term?
Normally 30% deposit with the remainder by TT before shipping, or L/C.
What's your delivery time?
Normally within 15 working days. For large quantities or during busy periods, delivery may take approximately one month.
What's your price term?
Available price terms:
- EXW: Poles Cost
- FOB: Pole Cost + Land Transportation + Fee on Port
- CFR: Pole Cost + Land Transportation + Fee on Port + Sea Freight
- CIF: Pole Cost + Land Transportation + Fee on Port + Sea Freight + Insurance