Specifications
Delivery Time :
30-40 work days
Price :
$7050/pieces
Payment Terms :
T/T
Suitable :
20t-52t Excavator
Brand :
China Famous Brand
OEM :
Support
Supply Ability :
600/ Years
MOQ :
1
Type :
Ordinary Product
Technique :
Advanced Techniques
Model :
Customer Required
Appliion :
Excavator
Quality :
High-Quality
Condition :
New
Packing :
Bubble Packing
Brand Name :
ZHONGHE
Apply to :
Building Engineering
Model Number :
EC480
Place of Origin :
Guangdong, China
Packaging Details :
Bubble bag packaging
Payment :
T/T
Description

ZHONGHE Heavy Industry: Precision Custom Solutions for Global Leaders
Backed by over a decade of industry leadership, we engineer bespoke attachments for excavators from Sany, XCMG and other world famous brands. We deliver complete, appliion-optimized solutions tailored to your specific operating conditions and technical requirements.

Product Description

Custom Excavator Pile Driving Boom Hydraulic Piling Arm Attachment

ZHONGHE Excavator Pile Hammer Boom Arm: Engineered for Extreme Duty

Key Advantages:

Enhanced Structural Longevity

Reinforced lower boom/arm cover plates

Custom Excavator Pile Driving Boom Hydraulic Piling Arm Attachment

Dual-direction reinforcement plates within box sections

Segmented thick-plate reinforcement at stick pivot points
Significantly extends service life in high-impact piling operations

Custom Excavator Pile Driving Boom Hydraulic Piling Arm Attachment

Maximum Operational Range

  • 160° boom-to-stick articulation

  • 88° boom-to-base rotation
    → *Optimized geometry expands working envelope by 25%+ versus standard arms*

Custom Excavator Pile Driving Boom Hydraulic Piling Arm Attachment

Simplified Maintenance

  • Segmented upper arm pipe design
    Enables rapid component replacement without full disassembly

Custom Excavator Pile Driving Boom Hydraulic Piling Arm Attachment

Primary Appliions:
Driving/extracting:

  • Sheet piles (Larsen/FZ types)

  • Steel rail piles

  • H-beam piles
    Critical foundation projects:

  • Flood control barriers

  • Embankment reinforcement

  • Drainage systems

  • Retaining walls

  • Slope stabilization

Custom Excavator Pile Driving Boom Hydraulic Piling Arm Attachment

Custom Excavator Pile Driving Boom Hydraulic Piling Arm Attachment

Custom Excavator Pile Driving Boom Hydraulic Piling Arm Attachment

Critical Installation Note:
For guaranteed performance and safety:
Reuse factory pins and linkage assemblies
Retain factory hydraulic hoses
Maintains original equipment load ratings and prevents compatibility issues

Precision Manufacturing Process: Strength Built on Quality

ZHONGHE's manufacturing prowess is the foundation of our product excellence. We implement a strictly controlled, lean production process:

1. Precision Design & Material Selection:

Professional structural design and stress analysis based on appliion requirements.

Strict sourcing of top-tier global steel (e.g., BS700/Q690D/Q355B structural steel).

Custom Excavator Pile Driving Boom Hydraulic Piling Arm AttachmentCustom Excavator Pile Driving Boom Hydraulic Piling Arm AttachmentCustom Excavator Pile Driving Boom Hydraulic Piling Arm Attachment

2. High-Precision Cutting & Forming:

CNC plasma/flame cutting ensures dimensional accuracy with minimal thermal distortion.

Custom Excavator Pile Driving Boom Hydraulic Piling Arm Attachment

Large structural components are precision-formed using heavy-duty press brakes and plate rollers.

Custom Excavator Pile Driving Boom Hydraulic Piling Arm Attachment

3. Advanced Welding Technology:

Operated by internationally certified senior welders.

Extensive use of high-strength processes like GMAW (Gas Metal Arc Welding).

Custom Excavator Pile Driving Boom Hydraulic Piling Arm Attachment

Critical joints feature double-beveled groove preparation (45°) with gas-shielded welding.

Key structural areas utilize double-pass welding.

Custom Excavator Pile Driving Boom Hydraulic Piling Arm AttachmentCustom Excavator Pile Driving Boom Hydraulic Piling Arm Attachment

4. Precision Machining & Assembly:

Large double-sided floor boring mills ensure high concentricity (±1mm tolerance) for pivot booms, extending lifespan.

Custom Excavator Pile Driving Boom Hydraulic Piling Arm Attachment

5. Triple-Check QC Protocol: Zero Tolerance for Defects:

Design Review: Rigorous approval of drawings and technical plans.

Custom Excavator Pile Driving Boom Hydraulic Piling Arm Attachment

In-Process Verifiion: 100% inspection after each manufacturing stage, checking prior process outputs. Problems are halted before proceeding.

Final Inspection: Our independent QC Department performs comprehensive checks, including:

Weld quality.

Custom Excavator Pile Driving Boom Hydraulic Piling Arm Attachment

Critical dimensional accuracy (CMM - Coordinate Measuring Machine, ±1mm tolerance control).

Hydraulic system pressure and seal integrity tests.

Functional tests (range of motion, limit switch protection).

Only products passing all three mandatory quality gates receive shipment authorization.

Company Profile

Custom Excavator Pile Driving Boom Hydraulic Piling Arm Attachment




Custom Excavator Pile Driving Boom Hydraulic Piling Arm AttachmentCustom Excavator Pile Driving Boom Hydraulic Piling Arm AttachmentCustom Excavator Pile Driving Boom Hydraulic Piling Arm Attachment

Custom Excavator Pile Driving Boom Hydraulic Piling Arm Attachment

Custom Excavator Pile Driving Boom Hydraulic Piling Arm Attachment

FAQ

  1. Do you have a Minimum Order Quantity (MOQ)? What is the production time?

    • No MOQ. We accept single-unit orders and custom designs.

    • Standard Production Lead Time: 7-15 working days for most orders, achievable through efficient scheduling and overtime.

    • Note: Final lead time depends on order complexity and volume. Our sales team will provide a precise timeline upon order confirmation.

  2. What payment methods do you accept?

    • Telegraphic Transfer (TT): 30% deposit to initiate production. Remaining 70% balance due prior to shipment.

  3. Why choose ZHONGHE over other suppliers?

    • Direct Factory Source: We are the manufacturer, eliminating middleman markups. You deal directly with the source for the best possible price.

    • Proven Choice: Many resellers source our products. Clients consistently choose us directly for superior value and efficiency.

    • Save Time & Cost: Deal directly with the factory for streamlined communiion and cost savings.

  4. What after-sales service do you provide?

    • Product Warranty: All long booms come with a standard warranty period.

    • Installation Support: Our technical support team provides guidance during installation to ensure correct and efficient assembly.

Any information, pls contact Ada!

this is my contact way directly
Ada W/A: +86 15322105263
Mail: abby@excavatorboomarm.com

Send your message to this supplier
Send Now

Custom Excavator Pile Driving Boom Hydraulic Piling Arm Attachment

Ask Latest Price
Watch Video
Delivery Time :
30-40 work days
Price :
$7050/pieces
Payment Terms :
T/T
Suitable :
20t-52t Excavator
Brand :
China Famous Brand
OEM :
Support
Contact Supplier
video
Custom Excavator Pile Driving Boom Hydraulic Piling Arm Attachment
Custom Excavator Pile Driving Boom Hydraulic Piling Arm Attachment
Custom Excavator Pile Driving Boom Hydraulic Piling Arm Attachment
Custom Excavator Pile Driving Boom Hydraulic Piling Arm Attachment
Custom Excavator Pile Driving Boom Hydraulic Piling Arm Attachment
Custom Excavator Pile Driving Boom Hydraulic Piling Arm Attachment

Kaiping Zhonghe Machinery Manufacturing Co., Ltd

Verified Supplier
5 Years
guangdong, jiangmen
Since 2018
Business Type :
Manufacturer, Seller
Total Annual :
1500000-2200000
Employee Number :
100~200
Certification Level :
Verified Supplier
Contact Supplier
Submit Requirement