Specifications
Brand Name :
ZHONGHE
Model Number :
SY500
Place of Origin :
Guangdong, China
MOQ :
1
Price :
$10420/pieces
Payment Terms :
T/T
Supply Ability :
600/ Years
Delivery Time :
30 work days
Packaging Details :
Bubble bag packaging
Appliion :
Excavator
Suitable :
50t Excavator
Model :
Customer Required
Apply to :
Building Engineering
Type :
Ordinary Product
Quality :
High-Quality
Brand :
China Famous Brand
Condition :
New
Technique :
Advanced Techniques
Payment :
T/T
Packing :
Bubble Packing
OEM :
Support
Description

ZHONGHE Heavy Industry: Precision Custom Solutions for Global Leaders
Backed by over a decade of industry leadership, we engineer bespoke attachments for excavators from Sany, XCMG and other world famous brands. We deliver complete, appliion-optimized solutions tailored to your specific operating conditions and technical requirements.

Product Description

Excavator Pile Driver Boom Arm OEM for Foundation & Solar Piling

ZHONGHE Excavator Pile Hammer Boom Arm: Engineered for Extreme Duty

Key Advantages:

Enhanced Structural Longevity

Reinforced lower boom/arm cover plates

Excavator Pile Driver Boom Arm OEM for Foundation & Solar Piling​

Dual-direction reinforcement plates within box sections

Segmented thick-plate reinforcement at stick pivot points
→ Significantly extends service life in high-impact piling operations

Excavator Pile Driver Boom Arm OEM for Foundation & Solar Piling

Maximum Operational Range

  • 160° boom-to-stick articulation

  • 88° boom-to-base rotation
    → *Optimized geometry expands working envelope by 25%+ versus standard arms*

Excavator Pile Driver Boom Arm OEM for Foundation & Solar Piling

Simplified Maintenance

  • Segmented upper arm pipe design
    → Enables rapid component replacement without full disassembly

​Excavator Pile Driver Boom Arm OEM for Foundation & Solar Piling

Primary Appliions:
Driving/extracting:

  • Sheet piles (Larsen/FZ types)

  • Steel rail piles

  • H-beam piles
    Critical foundation projects:

  • Flood control barriers

  • Embankment reinforcement

  • Drainage systems

  • Retaining walls

  • Slope stabilization

Excavator Pile Driver Boom Arm OEM for Foundation & Solar Piling

Excavator Pile Driver Boom Arm OEM for Foundation & Solar Piling

Excavator Pile Driver Boom Arm OEM for Foundation & Solar Piling

Critical Installation Note:
For guaranteed performance and safety:
✓ Reuse factory pins and linkage assemblies
✓ Retain factory hydraulic hoses
→ Maintains original equipment load ratings and prevents compatibility issues

Precision Manufacturing Process: Strength Built on Quality

ZHONGHE's manufacturing prowess is the foundation of our product excellence. We implement a strictly controlled, lean production process:

1. Precision Design & Material Selection:

Professional structural design and stress analysis based on appliion requirements.

Strict sourcing of top-tier global steel (e.g., BS700/Q690D/Q355B structural steel).

Excavator Pile Driver Boom Arm OEM for Foundation & Solar PilingExcavator Pile Driver Boom Arm OEM for Foundation & Solar PilingExcavator Pile Driver Boom Arm OEM for Foundation & Solar Piling

2. High-Precision Cutting & Forming:

CNC plasma/flame cutting ensures dimensional accuracy with minimal thermal distortion.

Excavator Pile Driver Boom Arm OEM for Foundation & Solar Piling

Large structural components are precision-formed using heavy-duty press brakes and plate rollers.

Excavator Pile Driver Boom Arm OEM for Foundation & Solar Piling

3. Advanced Welding Technology:

Operated by internationally certified senior welders.

Extensive use of high-strength processes like GMAW (Gas Metal Arc Welding).

Excavator Pile Driver Boom Arm OEM for Foundation & Solar Piling

Critical joints feature double-beveled groove preparation (45°) with gas-shielded welding.

Key structural areas utilize double-pass welding.

Excavator Pile Driver Boom Arm OEM for Foundation & Solar PilingExcavator Pile Driver Boom Arm OEM for Foundation & Solar Piling

4. Precision Machining & Assembly:

Large double-sided floor boring mills ensure high concentricity (±1mm tolerance) for pivot booms, extending lifespan.

Excavator Pile Driver Boom Arm OEM for Foundation & Solar Piling

5. Triple-Check QC Protocol: Zero Tolerance for Defects:

Design Review: Rigorous approval of drawings and technical plans.

Excavator Pile Driver Boom Arm OEM for Foundation & Solar Piling

In-Process Verifiion: 100% inspection after each manufacturing stage, checking prior process outputs. Problems are halted before proceeding.

Final Inspection: Our independent QC Department performs comprehensive checks, including:

Weld quality.

Excavator Pile Driver Boom Arm OEM for Foundation & Solar Piling

Critical dimensional accuracy (CMM - Coordinate Measuring Machine, ±1mm tolerance control).

Hydraulic system pressure and seal integrity tests.

Functional tests (range of motion, limit switch protection).

Only products passing all three mandatory quality gates receive shipment authorization.

​

Company Profile

Excavator Pile Driver Boom Arm OEM for Foundation & Solar Piling




Excavator Pile Driver Boom Arm OEM for Foundation & Solar PilingExcavator Pile Driver Boom Arm OEM for Foundation & Solar PilingExcavator Pile Driver Boom Arm OEM for Foundation & Solar Piling

Excavator Pile Driver Boom Arm OEM for Foundation & Solar Piling

Excavator Pile Driver Boom Arm OEM for Foundation & Solar Piling

FAQ

  1. Do you have a Minimum Order Quantity (MOQ)? What is the production time?

    • No MOQ. We accept single-unit orders and custom designs.

    • Standard Production Lead Time: 7-15 working days for most orders, achievable through efficient scheduling and overtime.

    • Note: Final lead time depends on order complexity and volume. Our sales team will provide a precise timeline upon order confirmation.

  2. What payment methods do you accept?

    • Telegraphic Transfer (TT): 30% deposit to initiate production. Remaining 70% balance due prior to shipment.

  3. Why choose ZHONGHE over other suppliers?

    • Direct Factory Source: We are the manufacturer, eliminating middleman markups. You deal directly with the source for the best possible price.

    • Proven Choice: Many resellers source our products. Clients consistently choose us directly for superior value and efficiency.

    • Save Time & Cost: Deal directly with the factory for streamlined communiion and cost savings.

  4. What after-sales service do you provide?

    • Product Warranty: All long booms come with a standard warranty period.

    • Installation Support: Our technical support team provides guidance during installation to ensure correct and efficient assembly.

Any information, pls contact Ada!

this is my contact way directly
Ada W/A: +86 15322105263
Mail: abby@excavatorboomarm.com

Send your message to this supplier
Send Now

Excavator Pile Driver Boom Arm OEM for Foundation & Solar Piling

Ask Latest Price
Watch Video
Brand Name :
ZHONGHE
Model Number :
SY500
Place of Origin :
Guangdong, China
MOQ :
1
Price :
$10420/pieces
Payment Terms :
T/T
Contact Supplier
video
Excavator Pile Driver Boom Arm OEM for Foundation & Solar Piling
Excavator Pile Driver Boom Arm OEM for Foundation & Solar Piling
Excavator Pile Driver Boom Arm OEM for Foundation & Solar Piling
Excavator Pile Driver Boom Arm OEM for Foundation & Solar Piling
Excavator Pile Driver Boom Arm OEM for Foundation & Solar Piling
Excavator Pile Driver Boom Arm OEM for Foundation & Solar Piling

Kaiping Zhonghe Machinery Manufacturing Co., Ltd

Verified Supplier
5 Years
guangdong, jiangmen
Since 2018
Business Type :
Manufacturer, Seller
Total Annual :
1500000-2200000
Employee Number :
100~200
Certification Level :
Verified Supplier
Contact Supplier
Submit Requirement