Core Product Keywords: Hydraulic Pile Driver, Photovoltaic Pile Driver, Specialized Pile Driver, Excavator-Mounted Pile Driver, FV Series Pile Hammer, Eco-Friendly Piling System.
Aimed at supporting the rapid growth of the photovoltaic industry in China, the YEKUN FV-250 to FV-400 series represents a purpose-built, industry-specific piling solution. As the exclusive manufacturer and supplier dedicated to the photovoltaic sector, we deliver customized, high-performance equipment designed to enhance efficiency, reduce environmental impact, and accelerate solar farm construction and related foundation projects.
| Model | Vibration (RPM) | Centrifugal Force (KN) | Max. Pile Length (m) | Compatible Excavator (T) | Total Weight (kg) |
|---|---|---|---|---|---|
| FV-280 | 2800 | 335 | 12 | 20–30 | 2400 |
| FV-300 | 3200 | 350 | 12 | 30–35 | 2770 |
| FV-350S | 3200 | 435 | 15 | 35–40 | 3070 |
| FV-350 | 3200 | 455 | 15 | 40–45 | 3350 |
| FV-400 | 3200 | 485 | 18 | 45–60 | 3450 |
Solar farm foundation piling, photovoltaic panel mounting systems, renewable energy infrastructure, and other construction projects requiring efficient, precise, and environmentally considerate piling solutions.
Q: Are your pile drivers specifically designed for photovoltaic projects?
A: Yes, the FV-250 to FV-400 series is purpose-built for the photovoltaic industry. We are the only manufacturer offering such tailored equipment for solar energy construction, ensuring optimal performance and efficiency.
Q: How does the noise reduction feature benefit photovoltaic projects?
A: The integrated rubber sheath reduces operational noise and vibration, which is particularly advantageous for projects near residential areas or in environmentally sensitive regions, supporting compliance with noise regulations and minimizing community disruption.
Q: What is the warranty coverage?
A: We provide a 12-month warranty from the installation completion date, covering the mainframe and key components (standard wear parts excluded).
Q: What is the minimum order quantity?
A: The minimum order quantity is one (1) set.
Q: What payment methods are accepted?
A: We accept Telegraphic Transfer (T/T).
Q: What is the delivery timeline?
A: Standard delivery is 7–35 days to Shanghai Port, with additional shipping time required based on the destination country.
Q: Can you customize the machine with our company logo?
A: Yes, we offer OEM services and can apply your logo or branding upon request.
Q: How is product quality ensured?
A: All equipment is manufactured in strict compliance with the national “Technical Conditions for Pile Driver Enterprises” standards, supported by rigorous quality control throughout the production process.
Founded in 2009, Shanghai Yekun Construction Machinery Co., Ltd. specializes in the design, production, and service of high-speed hydraulic pile drivers. With a focus on innovation and industry-specific solutions, we support the advancement of infrastructure and renewable energy projects through reliable, efficient, and environmentally conscious equipment.