Pile Driver, Blue Excavator Mounted Pile Driver, Hydraulic Vibrating Pile Driver, Universal Excavator Pile Driver, Low Noise Pile Driver, Multi-Pile Type Pile Driver, High-Efficiency Pile Driver, Construction Pile Driver
Shanghai Yekun Machinery Co., Ltd., founded in 2014, is a professional enterprise specializing in the manufacture, sales and service of hydraulic vibrating pile drivers. Our flagship product, the Blue Hydraulic Excavator Mounted Pile Driver, stands out with its distinctive blue design while delivering exceptional performance, making it a preferred choice for infrastructure and construction industries.
This pile driver integrates advanced hydraulic technology and user-centric design, compatible with excavators of any brand and capable of handling diverse piling tasks. We adhere to the latest industrial technology for strict quality control, cooperate with engineering machinery factories and construction companies for joint R&D, and hire foreign professionals as technical advisors to ensure product excellence. Backed by a young, enthusiastic and professional team, we uphold the principles of “client as priority, quality as first concern, management as foundation” and strive to become the most professional and comprehensive hydraulic vibrating pile driver manufacturer and service supplier.
| Item | FV-250 | FV-280 | FV-300 | FV-330 | FV-350S | FV-350 | FV-400 |
|---|---|---|---|---|---|---|---|
| Vibration Frequency (rpm) | 2500 | 2800 | 3200 | 3200 | 3200 | 3200 | 3200 |
| Operation Pressure (Mpa) | 30 | 32 | 32 | 32 | 32 | 32 | 32 |
| Centrifugal Force (KN) | 265 | 335 | 350 | 372 | 435 | 455 | 485 |
| Max. Pile Length (m) | 10 | 12 | 12 | 12 | 15 | 15 | 18 |
| Arm Weight (kg) | 500 | 500 | 670 | 670 | 670 | 750 | 750 |
| Hammer Weight (kg) | 1700 | 1900 | 2100 | 2300 | 2400 | 2600 | 2700 |
| Matching Excavator (T) | 20-30 | 20-30 | 30-35 | 33-40 | 35-40 | 40-45 | 45-60 |
Q: What is the warranty period for the blue excavator mounted pile driver?
A: The warranty period is 12 months from the date of completion of installation, covering the mainframe and key components, excluding wearing parts.
Q: What is the minimum order quantity (MOQ) for this pile driver?
A: The MOQ is one set, which is flexible enough to meet the needs of both trial purchases and large-scale bulk orders.
Q: Which payment methods do you accept for pile driver orders?
A: We accept T/T (Telegraphic Transfer).
Q: What is the delivery time for the pile driver?
A: The production delivery time is generally 1-8 days, and the products will be delivered to Shanghai Port. For overseas orders, please take the additional shipping time to your destination into consideration.
Q: Can I customize my own LOGO on the blue pile driver?
A: Of course you can. We provide LOGO customization service to help you promote your brand on the equipment.
Q: How do you ensure the quality of your pile driver products?
A: All our pile driver equipment is strictly produced and inspected in full compliance with the technical standards specified in the "Technical Conditions for Pile Driver Enterprises".
Q: Can I apply to be a dealer of your pile driver products?
A: We warmly welcome you to become our dealer. We are also looking forward to further developing into regional general agents and strategic partners with ambitious partners like you.