The YEKUN Solar Pile Driver is a specialized, eco-friendly foundation solution engineered for the rapid development of the photovoltaic industry. As the sole manufacturer dedicated to this sector, our equipment overcomes traditional limitations by delivering large vibration force with high efficiency, all while operating with minimal noise, vibration, and pollution. It is designed to maximize piling capacity for matched excavators, significantly reducing fuel and equipment costs for solar farm construction.
Pile Driver, Solar Pile Driver, Photovoltaic Pile Driver, Eco-Friendly Pile Driver, Hydraulic Pile Driver, High-Efficiency Pile Driver
| Model | FV-250 | FV-280 | FV-300 | FV-330 | FV-350S | FV-350 | FV-400 |
|---|---|---|---|---|---|---|---|
| Vibration Frequency (rpm) | 2500 | 2800 | 3200 | 3200 | 3200 | 3200 | 3200 |
| Centrifugal Force (kN) | 265 | 335 | 350 | 372 | 435 | 455 | 485 |
| Max. Pile Length (m) | 10 | 12 | 12 | 12 | 15 | 15 | 18 |
| Excavator Compatibility (T) | 20-30 | 20-30 | 30-35 | 33-40 | 35-40 | 40-45 | 45-60 |
Q: Why is this pile driver considered eco-friendly?
A: It operates with no noise, no ground vibration, and no air pollution, making it compliant with strict environmental standards.
Q: Are you the only manufacturer for photovoltaic pile drivers?
A: Yes, we are the dedicated manufacturer specializing in pile drivers tailored for the solar energy industry.
Q: What is the warranty period?
A: We offer a 12-month warranty on the mainframe and key components (excluding wear parts).
Q: What is the minimum order quantity?
A: The MOQ is one set.
Q: What payment metHods do you accept?
A: We accept T/T.
Q: How long is the delivery time: Delivery to Shanghai Port typically takes 1-8 days, plus international shipping time.
Q: Can you customize the machine with our logo?
A: Yes, we provide logo customization.
Q: Can I become a dealer?
A: We welcome dealers and regional agents for long-term strategic partnerships.