This Monel K500 forged tubesheet is critical pressure‑bearing component for heavy‑duty shell‑and‑tube heat exchangers. Produced from premium Monel K500 alloy ingot by multi‑direction open‑die upsetting and stretching forging, followed by solution annealing and stress‑relief heat‑treatment to obtain homogeneous full‑thickness metallographic structure, eliminating segregation and internal defects.
The alloy gains higher strength after aging precipitation hardening treatment. After rough machining, full non‑destructive testing and precision CNC deep‑hole drilling for tube‑hole array, the tubesheet is ready for tube bundle assembly via expansion or strength welding. Compared with Monel 400, K500 delivers significantly higher yield and tensile strength while preserving excellent seawater and brine corrosion resistance. Widely used for marine, offshore platform, oil‑gas and chemical heat‑exchanger equipment under corrosive salt‑containing working environment.
表格
| Grade | EN Standard No. | C ≤ | Si ≤ | Mn ≤ | S ≤ | Fe ≤ | Al | Ti | Ni+Co | Cu |
|---|---|---|---|---|---|---|---|---|---|---|
| Monel K500 | 2.4375 | 0.25 | 0.50 | 1.50 | 0.010 | 2.00 | 2.30‑3.15 | 0.35‑0.85 | ≥63.0 | 27.0‑33.0 |
表格
| Property | Monel K500 Tubesheet (Solution Annealed) |
|---|---|
| Delivery Condition | Solution Annealed, Stress‑Relieved, UT & MT Inspected |
| Minimum Tensile Strength | ≥690 MPa |
| Minimum 0.2% Yield Strength | ≥310 MPa |
| Minimum Elongation (50mm gauge) | ≥30 % |
| Brinell Hardness | ≤285 HB |
‑ Nickel‑Copper Series: Monel 400, Monel K500 ‑ Nickel‑Base Alloy: Inconel 600, 625, 718, Hastelloy C276, Hastelloy B3 ‑ Titanium Alloy: TA1, TA2 ‑ Duplex Stainless Steel: 2205, 2507 ‑ Austenitic Stainless Steel: 304, 316L, 321 ‑ Alloy & Carbon Steel Forgings: A105, 42CrMo, F22
‑ Offshore platform seawater coolers, marine shell‑and‑tube heat exchangers and condensers ‑ Oil & gas industry brine‑medium process heat‑exchanger core pressure‑bearing components ‑ Desalination plant heat‑exchange equipment and salt‑water processing units ‑ Chemical industry non‑oxidizing acid and salt‑containing medium heat‑transfer equipment ‑ Off‑shore engineering custom pressure vessels with high corrosion‑fatigue requirements ‑ Special heat‑exchanger equipment for marine and coastal heavy‑industrial facilities
We provide integrated heavy nickel‑alloy forging, heat‑treatment and full precision machining services, produce finished Monel K500 tubesheet strictly according to customer CAD/PDF drawings: ‑ Premium Monel K500 alloy ingot selection, multi‑upsetting open‑die forging ‑ Solution annealing, stress‑relief and custom aging precipitation hardening heat‑treatment ‑ Rough turning/milling to remove forging scale and surface defects ‑ CNC vertical lathe, gantry boring‑milling, multi‑spindle deep‑hole drilling for tube‑hole array, bolt holes, sealing grooves and locating steps ‑ Pickling and passivation, anti‑rust protective covering for machined sealing surfaces
We supply custom Monel K500 forged tubesheets for heat‑exchanger and pressure‑vessel manufacturers across marine, offshore, oil‑gas and chemical sectors worldwide.
‑ 100% UT Ultrasonic Testing for internal forging flaws complying with ASTM B865 and pressure‑vessel standards ‑ MT Magnetic Particle Inspection for surface crack detection ‑ Tensile test, hardness measurement for mechanical‑property verification ‑ Spectrometer PMI full‑spectrum chemical‑composition analysis for each forging lot ‑ High‑precision CMM dimensional inspection for diameter, thickness, hole pitch and critical tolerances
Mill Test Certificate EN 10204 3.1 can be provided together with shipment documents before delivery. Third‑party inspection witness is available upon request.
Packing ‑ Inner packaging: waterproof anti‑rust plastic film, dedicated protective covers for machined sealing faces and tube‑hole openings to prevent scratch, dust and corrosion ‑ Outer packaging: reinforced fumigated heavy‑duty wooden case or high‑strength steel‑frame crate for long‑distance sea transportation ‑ Custom special packaging available on customer request for oversized and heavy‑weight forgings
Lead Time Normally 35‑55 working days after receipt of advance payment. Exact delivery time depends on forging dimension, thickness, aging heat‑treatment requirement, CNC drilling complexity and third‑party inspection schedule.