Specifications
Brand Name :
Zhonghe
Model Number :
DZB001
Certification :
CE
Place of Origin :
Guangdong, China
MOQ :
1 piece
Price :
$10000/pieces
Payment Terms :
T/T
Supply Ability :
5 Piece/Pieces per Month
Delivery Time :
25-30 work day
Packaging Details :
Bubble bag packaging
Part name :
Excavator Pile Driving Arm
Material :
Q355B, or others as you request
Applicable Industries :
Energy & Mining & Demolition
Suitable excavator :
35-50Ton
Length (m) :
15-18m
Color :
as customer requires
Warranty :
6 Months
Condition :
100%new
Quality :
High-Quality
MOQ :
1 PCS
Packing :
Standard Packing
After-sales service provided :
Online Video support
Description

Heavy Duty Excavator 18M Piling Boom and Arm for 35-50 Ton Excavators for Foundation ConstructionHeavy Duty Excavator 18M Piling Boom and Arm for 35-50 Ton Excavators for Foundation Construction

Product Name Pile Driving Boom Arm
Material Q355B/Q690D
Suitable Excavator 20-52ton
Colors Yellow/Red/Orange/Customizable
Length 11-18.5m
Heavy Duty Excavator 18M Piling Boom and Arm for 35-50 Ton Excavators for Foundation ConstructionHeavy Duty Excavator 18M Piling Boom and Arm for 35-50 Ton Excavators for Foundation Construction
Excavator (ton) Total Length (mm) Boom (mm) Arm (mm) Piling Height (mm) Counterweight (Ton)
30-36 13800 10000 3800 15400 3
30-36 15000 10500 4500 17100 5
40-45 15800 11000 4800 17900 3
40-45 16800 11500 5300 18500 5-6
45-50 19000 12500 6500 21000 6-7

Advantages of excavator pile driving boom arm / Pile Machines

The angle between boom and horizon can reach 88°,The angle between boom and arm can reach 160°

1. Comparing with the same length pile driving arm, ours can pile higher.

2. Adopt 90 degree elbow joint to avoid hose bending and increase it service life

3. The box has built-in transverse and vertical reinforcement ribs to improve pile driving boom tensile strength

4. Seamless precision steel pipe

5. Centralized lubrication system

6. three layers with four passes welding

7. The boom seat sleeve adopts all in one molding process

8. Graphite alloy copper sleeve

9. Hydraulic pipelines section design, convenient for later maintenance

10. Multi-layer reinforcing rib plate at the stress place, more firm, integrated molding

11. The back bushing of the pile arm is wrapped by the whole board to avoid falling off

Heavy Duty Excavator 18M Piling Boom and Arm for 35-50 Ton Excavators for Foundation ConstructionHeavy Duty Excavator 18M Piling Boom and Arm for 35-50 Ton Excavators for Foundation ConstructionHeavy Duty Excavator 18M Piling Boom and Arm for 35-50 Ton Excavators for Foundation Construction

Some pictures of pile driving boom armHeavy Duty Excavator 18M Piling Boom and Arm for 35-50 Ton Excavators for Foundation ConstructionHeavy Duty Excavator 18M Piling Boom and Arm for 35-50 Ton Excavators for Foundation ConstructionHeavy Duty Excavator 18M Piling Boom and Arm for 35-50 Ton Excavators for Foundation Construction

Heavy Duty Excavator 18M Piling Boom and Arm for 35-50 Ton Excavators for Foundation Construction Heavy Duty Excavator 18M Piling Boom and Arm for 35-50 Ton Excavators for Foundation Construction

Heavy Duty Excavator 18M Piling Boom and Arm for 35-50 Ton Excavators for Foundation ConstructionHeavy Duty Excavator 18M Piling Boom and Arm for 35-50 Ton Excavators for Foundation ConstructionHeavy Duty Excavator 18M Piling Boom and Arm for 35-50 Ton Excavators for Foundation ConstructionHeavy Duty Excavator 18M Piling Boom and Arm for 35-50 Ton Excavators for Foundation ConstructionHeavy Duty Excavator 18M Piling Boom and Arm for 35-50 Ton Excavators for Foundation ConstructionHeavy Duty Excavator 18M Piling Boom and Arm for 35-50 Ton Excavators for Foundation ConstructionHeavy Duty Excavator 18M Piling Boom and Arm for 35-50 Ton Excavators for Foundation Construction

Heavy Duty Excavator 18M Piling Boom and Arm for 35-50 Ton Excavators for Foundation Construction

Quality Control

Post-welding Testing
Accuracy Testing
Weld bead testing
Testing before send out goods
Operation Testing


The first system is the technical design drawing review mechanism
The second system is the semi-finished product review mechanism,(each process has a detection testing for the previous process)

The third system is the finished product testing.
(Before painting, the overall inspection is carried out to check whether the design size matches the welding size, and whether theinstallation size meets the design requirement.)
To sum up, every single ZHONGHE product has been passed the above three-stage inspection system to ensure that is qualified before shipping.
Heavy Duty Excavator 18M Piling Boom and Arm for 35-50 Ton Excavators for Foundation Construction

Heavy Duty Excavator 18M Piling Boom and Arm for 35-50 Ton Excavators for Foundation ConstructionHeavy Duty Excavator 18M Piling Boom and Arm for 35-50 Ton Excavators for Foundation ConstructionHeavy Duty Excavator 18M Piling Boom and Arm for 35-50 Ton Excavators for Foundation Construction

Heavy Duty Excavator 18M Piling Boom and Arm for 35-50 Ton Excavators for Foundation Construction

Heavy Duty Excavator 18M Piling Boom and Arm for 35-50 Ton Excavators for Foundation Construction

Send your message to this supplier
Send Now

Heavy Duty Excavator 18M Piling Boom and Arm for 35-50 Ton Excavators for Foundation Construction

Ask Latest Price
Watch Video
Brand Name :
Zhonghe
Model Number :
DZB001
Certification :
CE
Place of Origin :
Guangdong, China
MOQ :
1 piece
Price :
$10000/pieces
Contact Supplier
video
Heavy Duty Excavator 18M Piling Boom and Arm for 35-50 Ton Excavators for Foundation Construction
Heavy Duty Excavator 18M Piling Boom and Arm for 35-50 Ton Excavators for Foundation Construction
Heavy Duty Excavator 18M Piling Boom and Arm for 35-50 Ton Excavators for Foundation Construction
Heavy Duty Excavator 18M Piling Boom and Arm for 35-50 Ton Excavators for Foundation Construction
Heavy Duty Excavator 18M Piling Boom and Arm for 35-50 Ton Excavators for Foundation Construction
Heavy Duty Excavator 18M Piling Boom and Arm for 35-50 Ton Excavators for Foundation Construction
Heavy Duty Excavator 18M Piling Boom and Arm for 35-50 Ton Excavators for Foundation Construction
Heavy Duty Excavator 18M Piling Boom and Arm for 35-50 Ton Excavators for Foundation Construction

Jiangmen Kaiping Zhonghe Machinery Manufacturing Co., Ltd

Verified Supplier
2 Years
guangdong
Since 2018
Business Type :
Manufacturer, Exporter, Seller
Total Annual :
30000000-90000000
Employee Number :
100~200
Certification Level :
Verified Supplier
Contact Supplier
Submit Requirement