Specifications
Brand Name :
Zhonghe
Model Number :
DZB001
Certification :
CE
Place of Origin :
Guangdong, China
MOQ :
1 piece
Price :
$15000/pieces
Payment Terms :
T/T
Supply Ability :
5 Piece/Pieces per Month
Delivery Time :
25-30 work day
Packaging Details :
Bubble bag packaging
Material :
Q355B
Application :
Building Engineering
Type :
Ordinary Product
Warranty :
1 Year
Length (m) :
15-18m
Color :
Yellow/Gray/Red/Green/Customizable
Quality :
High-Quality
MOQ :
1 PCS
Packing :
Bubble bag packaging
Technique :
Advanced Techniques
Payment :
T/T
Video outgoing-inspection :
Provided
Description

High Strength Excavator Hydraulic 18M Piling Boom and Arm for Sany 650 Doosan 520 for Foundation ConstructionHigh Strength Excavator Hydraulic 18M Piling Boom and Arm for Sany 650 Doosan 520 for Foundation Construction

High Strength Excavator Hydraulic 18M Piling Boom and Arm for Sany 650 Doosan 520 for Foundation Construction
Product Name
Pile driving boom arm
Material
Q355B/Q690D
Suitable excavator
40-50ton
Colors
Yellow/Red/Orange/Customizable
Length
15-15.8m
High Strength Excavator Hydraulic 18M Piling Boom and Arm for Sany 650 Doosan 520 for Foundation Construction

High Strength Excavator Hydraulic 18M Piling Boom and Arm for Sany 650 Doosan 520 for Foundation Construction

ZHONGHE Excavator Pile Harmmer Boom Arm advantages

1.Good quality: the lower cover plates of the boom and arm are thickened, the interior of the box adopts two-way reinforcement plate design, the small arm ear’s bearing position is treated with segmented thickened plate, which improves the overall service life of the pile arm.
2. Open angle of boom and arm can achieve 160°, and the Angle of the large arm and the base can reach 88°, which larger the overall working range.

3. The steel pipe above the large arm is designed in sections to facilitate the later maintenance.

Applications of Excavator Pile Driving Boom

It can drive and pull sheet pile, steel rail pile, H steel rail pile and H steel sheet pile, and is applicable to the construction of foundation works such as flood control, embankment, drainage, earthwork, retaining wall and slope surface

Warning if you buy our Pile Driving Long Reach Boom Arm for Excavator

To save your cost, all pins and linkage assembly use the original one, and the high pressure hose of the arm cylinder also use the original one.

High Strength Excavator Hydraulic 18M Piling Boom and Arm for Sany 650 Doosan 520 for Foundation ConstructionHigh Strength Excavator Hydraulic 18M Piling Boom and Arm for Sany 650 Doosan 520 for Foundation Construction

Some pictures of pile driving boom armHigh Strength Excavator Hydraulic 18M Piling Boom and Arm for Sany 650 Doosan 520 for Foundation ConstructionHigh Strength Excavator Hydraulic 18M Piling Boom and Arm for Sany 650 Doosan 520 for Foundation ConstructionHigh Strength Excavator Hydraulic 18M Piling Boom and Arm for Sany 650 Doosan 520 for Foundation Construction

High Strength Excavator Hydraulic 18M Piling Boom and Arm for Sany 650 Doosan 520 for Foundation Construction

High Strength Excavator Hydraulic 18M Piling Boom and Arm for Sany 650 Doosan 520 for Foundation ConstructionHigh Strength Excavator Hydraulic 18M Piling Boom and Arm for Sany 650 Doosan 520 for Foundation ConstructionHigh Strength Excavator Hydraulic 18M Piling Boom and Arm for Sany 650 Doosan 520 for Foundation ConstructionHigh Strength Excavator Hydraulic 18M Piling Boom and Arm for Sany 650 Doosan 520 for Foundation ConstructionHigh Strength Excavator Hydraulic 18M Piling Boom and Arm for Sany 650 Doosan 520 for Foundation ConstructionHigh Strength Excavator Hydraulic 18M Piling Boom and Arm for Sany 650 Doosan 520 for Foundation ConstructionHigh Strength Excavator Hydraulic 18M Piling Boom and Arm for Sany 650 Doosan 520 for Foundation ConstructionHigh Strength Excavator Hydraulic 18M Piling Boom and Arm for Sany 650 Doosan 520 for Foundation Construction

High Strength Excavator Hydraulic 18M Piling Boom and Arm for Sany 650 Doosan 520 for Foundation Construction

Quality Control

Post-welding Testing
Accuracy Testing
Weld bead testing
Testing before send out goods
Operation Testing


The first system is the technical design drawing review mechanism
The second system is the semi-finished product review mechanism,(each process has a detection testing for the previous process)

The third system is the finished product testing.
(Before painting, the overall inspection is carried out to check whether the design size matches the welding size, and whether theinstallation size meets the design requirement.)
To sum up, every single ZHONGHE product has been passed the above three-stage inspection system to ensure that is qualified before shipping.
High Strength Excavator Hydraulic 18M Piling Boom and Arm for Sany 650 Doosan 520 for Foundation Construction

High Strength Excavator Hydraulic 18M Piling Boom and Arm for Sany 650 Doosan 520 for Foundation Construction

High Strength Excavator Hydraulic 18M Piling Boom and Arm for Sany 650 Doosan 520 for Foundation Construction

High Strength Excavator Hydraulic 18M Piling Boom and Arm for Sany 650 Doosan 520 for Foundation Construction

Send your message to this supplier
Send Now

High Strength Excavator Hydraulic 18M Piling Boom and Arm for Sany 650 Doosan 520 for Foundation Construction

Ask Latest Price
Watch Video
Brand Name :
Zhonghe
Model Number :
DZB001
Certification :
CE
Place of Origin :
Guangdong, China
MOQ :
1 piece
Price :
$15000/pieces
Contact Supplier
video
High Strength Excavator Hydraulic 18M Piling Boom and Arm for Sany 650 Doosan 520 for Foundation Construction
High Strength Excavator Hydraulic 18M Piling Boom and Arm for Sany 650 Doosan 520 for Foundation Construction
High Strength Excavator Hydraulic 18M Piling Boom and Arm for Sany 650 Doosan 520 for Foundation Construction
High Strength Excavator Hydraulic 18M Piling Boom and Arm for Sany 650 Doosan 520 for Foundation Construction
High Strength Excavator Hydraulic 18M Piling Boom and Arm for Sany 650 Doosan 520 for Foundation Construction
High Strength Excavator Hydraulic 18M Piling Boom and Arm for Sany 650 Doosan 520 for Foundation Construction
High Strength Excavator Hydraulic 18M Piling Boom and Arm for Sany 650 Doosan 520 for Foundation Construction
High Strength Excavator Hydraulic 18M Piling Boom and Arm for Sany 650 Doosan 520 for Foundation Construction

Jiangmen Kaiping Zhonghe Machinery Manufacturing Co., Ltd

Verified Supplier
2 Years
guangdong
Since 2018
Business Type :
Manufacturer, Exporter, Seller
Total Annual :
30000000-90000000
Employee Number :
100~200
Certification Level :
Verified Supplier
Contact Supplier
Submit Requirement