XY-2PC core exploration drilling rig
Product Description
It can be used for drilling in tunnels and galleries, as well as geological area surveys. It is suitable for geological surveys in construction, hydropower engineering, highways, railways, ports, and other engineering projects, providing data support for engineering design. It can also be used for drilling micro pile foundation holes to meet the basic engineering needs of small buildings or special geological conditions.
Product Tech Data
Drill rig specification |
Drilling depth | 300m |
Drilling Diameter | 91mm,110mm,130mm,150mm,300mm |
Drilling rod diameter | 50mm |
Drilling Angle | 0°-90° |
Dimensions(L×W×H) | 1720×800×1300 (mm) |
Weight | 650kg(Lightweight) |
Swivel Head |
Spindle Speed | 164, 298, 334, 587, 1190 r/min |
Spindle stroke | 500mm |
Spindle Dia. | Φ59mmx53mmx5500mm Kelly rod |
Spindle lifting capacity max | 25KN |
Hoist |
Max. Lifting capacity(single rope) | 20KN.m |
Lifting rotating speed | 20; 40; 90; 168r/min |
Wire rope diameter | 14 |
Wire rope capability | 30KN |
The XY-2PC drilling rig has a wide range of applications, mainly including the following fields
1.Geological exploration: can be used for geological area survey, drilling and sampling different strata to understand the underground geological structure and distribution of mineral resources. It is also suitable for drilling in tunnels and galleries, providing detailed underground information for geological exploration.
2.Engineering survey: In the construction of buildings, hydropower projects, highways, railways, ports and other engineering projects, engineering geological survey can be conducted to provide geological data for engineering design and construction, such as determining the bearing capacity and geological structure of the foundation. It can also be used for drilling micro pile foundation holes, providing support for small building foundations or foundation construction under special geological conditions.
3.Other applications: Suitable for construction of hydropower systems, such as exploration of dam foundations, drilling of grouting holes, etc. It can also be used for drilling high slope anchor rods and cables, as well as related drilling work in geological hazard control.
Safety precautions
The efficient operation of XY-2PC drilling rig requires a combination of equipment characteristics (lightweight, multi speed, hydraulic feed) and geological conditions, through reasonable parameter adjustment, standardized maintenance and emergency response capabilities, to ensure construction quality and safety. In practical operations, it is recommended to develop a drilling plan in advance based on the on-site geological survey report, and keep good log records to gradually accumulate targeted experience.