Serving mold factories and metal‑processing enterprises, the VMC1160 vertical machining center adopts finite‑element‑simulated heavy‑duty cast structure for balanced rigidity and weight. Equipped with FANUC 0i MF(3B) Plus CNC system and Taiwan Okada BT40 12000rpm belt‑drive spindle, this 3‑axis machine completes milling, boring, drilling, reaming and tapping in one‑time workpiece clamping. All main castings are HT300 cast iron with stress‑relief heat‑treatment. X/Y/Z axes adopt Taiwan HIWIN 45 mm roller linear guides with six‑slider Z‑axis support. It is equipped with 24‑station disc‑type tool magazine, spindle oil chiller, Renishaw tool setter and workpiece probe, automatic lubrication and cooling system, full‑closed safety guard. Suitable for plate, disc, shell‑shaped workpieces and mold production. We provide complete delivery documents and standard after‑sales support for bulk‑order customers.
| Parameter Item | Detailed Specifications |
|---|---|
| Worktable Dimension | 1200×600mm |
| Max Worktable Bearing Load | 800kg |
| Worktable T‑slot Spec | 5 slots ×18mm ×100mm |
| X/Y/Z‑Axis Travel | 1100/600/600mm |
| Spindle Nose to Table Distance | 120‑720mm |
| Spindle Taper | BT40 |
| Max Spindle Speed | 12000rpm |
| Spindle Motor Power | 11/15kW |
| X/Y/Z Servo Motor Torque | 20/20/20Nm (with power‑off brake) |
| X/Y/Z Rapid Traverse | 36/36/30 m/min |
| Cutting Feed Range | 1‑10000 mm/min |
| Tool Magazine Type | Disc‑type ATC |
| Standard Tool Capacity | 24 pcs |
| X/Y/Z Positioning Accuracy | ±0.004mm /300mm |
| X/Y/Z Repeat Positioning Accuracy | ±0.003mm /300mm |
| Approx Net Weight | 6300kg |
Q1: How long is the manufacturing for a CNC machining center?
A: Standard machine production typically takes 25-35 days.
Q2: What documents are delivered together with machine?
A: Machine operation manual, inspection report, system manual and product certificate are supplied.
Q3: What post-purchase technical support is available for overseas clients?
A: We provide remote digital diagnostics, comprehensive operation video manuals, and optional on-site installation and operator training delivered by senior engineers.