Specifications
Brand Name :
KOMEG
Model Number :
TST-360A
Certification :
CE, ISO
Place of Origin :
China, Guangdong
MOQ :
1SET
Price :
negotiation
Payment Terms :
T/T, negotiable
Supply Ability :
1, 000 SETS / YEAR
Delivery Time :
50 days upon your deposit
Packaging Details :
Packed with film firstly, and then reinforced with wooden case for outer packing
Application :
Indoor, Lab, Testing Center in LED industry
High temperature chamber :
+60~200℃
Conversion Time :
3 Min
Internal Volume :
1000L
Test chamber Temp. Range :
-40ºC~+150ºC
Cooling Method :
Water cooled
Description

High and low temprature thermal shock testing chamber

3-Zone Thermal Shock Chambers Working Principle:

The three-zone type thermal shock test chamber. Sample is placed in the test chamber, more extreme temperature than test temperature can be set in high-temperature chamber and low-temperature chamber. During low temperature test, cold chamber door open, and low-temperature chamber working together with test chamber. When converted into high-temperature test, cold chamber door closed, hot chamber door are opened, and test chamber working together with high-temperature chamber.

Conversion of mechanical action (transferring from high temperature to low temperature or low temperature to high temperature) can be completed in less than 1 second, and the temperature can be quickly stabilized.

During the whole test, test sample is no need to be moved, and without any human intervention.

Below are differences between 3-zone and 2-zone thermal shock chamber:

3-zone thermal shock chamber:

three chamber in total: test space, high temp. chamber and low temp. chamber;

Advantage: slight limitation for test sample’s weight, the test sample keep still, this can reduce the impact to samples by moving it, can be used for on-load testing.

Compared with 2-zone type, relatively low failure rate, low cost.

Disadvantage: long conversion time

2-zone thermal shock chamber:

only two chambers: high temp. Chamber and low temp. chamber

Advantage: short conversion time, smaller space needed

Disadvantage: test sample moving. test samples’ size is limited by the basket size

1. Introduction of thermal shock chamber:

3-Zone Thermal Shock Chambers Application:

Such chambers heretofore known include one comprising a test area for the test sample, a high-temperature air conditioning unit having gas outlet and intake adapted to communicate with the test area, an outside air supplying unit having air outlet and inlet adapted to communicate with the test area, and a low-temperature air conditioning unit having gas outlet and intake adapted to communicate with the test area.
The thermal shock chamber of this type is provided with three dampers, i.e., one for opening or closing the gas outlet and intake of the high-temperature air conditioning unit, another for the air outlet and inlet of the outside air supplying unit, and another for the gas outlet and intake of the low-temperature air conditioning unit.

1.2 ​Corresponding standard:

1 GB/T2423.1-1989 low-temperature testing method
2 GB/T2423.2-1989 high-temperature testing method
3 GB/T2423.22-1989 change temperature test
4 GJB150.5-86 temperature impact test
5 GJB360.7-87 temperature impact test
6 GJB367.2-87 405 temperature impact test


1.3 KOMEG offers several configurations of thermal shock chambers capable of meeting a wide variety of testing needs.
Vertical, two zone chamber has hot and cold zones that can be controlled independently.
Horizontal, three zone thermal shock chamber utilizes controlled areas for hot, ambient and cold temperatures.
Double duty thermal shock chambers from KOMEG are designed with hot zones above and below the cold zone and a two compartment product carrier that simultaneously moves products between the hot and cold zones.

2. More Info About KOMEG's Products You Need to Know

2.1 Refrigeration system characteristics
1. Import compressor, reduce the operating noisy, better performance;
2.The unit module standardization. Set up the bend language manual, ensure that make unity. Cooling line adopts advanced bend language process, ensure refrigeration accurate, uniform;
3.The operation of refrigeration system adopt intelligent control, power consumption is small, all refrigeration parts adopt international famous brand, quality assured for long-term stable operation.
4.Modular making, ease to install, repair and maintenance; Air-cooled condenser of refrigeration unit add the filter net, ensue the normal operation;
5.Intelligent cooling capacity adjustment, good control effect. Wide range of load.

2.2 Structure Features

Wall material:Top-grade Carbon Steel Plate,Surface electrostatic color Spray processing

Inner wall material:Stainless Steel Plate SUS304

Body insulation material:Rigid polyurethane Foam + glass fiber

Door insulation material:Rigid Polyurethane Foam + Glass fiber

2.3 Material:

Interior material: Stainless Steel Plate SUS304#

Exterior material: Baked Painting Steel Plate or Stainless Steel SUS304#

Insulation material: Rigid polyurethane Foam and Glass Fiber Wool

3. Why KOMEG Will Be Your Best Choice?

The controller system features:

Centralized controller, recorder, computer triad controller;

1. Provide USB port, R485 interface, USB download;

2. Large capacity may save 13450 segments, with super long running of 530 hours each segments.

3. Program loop can be 32000 times, tiny loop 32000 times;

4. Large built-in storage, can store 90 - day calendar data, historical curve (when the sample is 1 min)

5. Support English, Chinese and so on.

4. Specifications

Model
TST-A Series
70A 130A 226A 360A 500A
Test weight(KG) 5 5 5 5 10
Interior size W(mm) 410 520 610 710 810
H(mm) 560 670 770 830 710
D(mm) 410 520 610 770 860
Basket size W(mm) 300 410 510 610 710
H(mm) 300 410 510 730 610
D(mm) 300 410 510 510 730
Low Temp. chamber -55ºC~-10ºC
Pre-cooling time +20ºC~-55ºC, Within 60 min
Test. chamber -40ºC~+150ºC
High Temp. chamber +60ºC~+200ºC
Pre-heating time +60ºC~+200ºC ,Within 25 min
Recovery time High-Temp Exposure 30 min
Low-Temp Exposure 30 min
Recovery time within 3 min
Safety device

No fuse breaker, over pressure, over heat and over current protection

for compressor,over temperature protection, over load protection for blower, dry heat protection

Standard accessory Cable port(portΦ50mm)*1, shelves*2
Interior material Stainless steel plate(SUS 304)
Exterior material Baked painting steel or stainless steel(SUS304)
Insulation material Rigid polyurethane Foam+glass fiber wool
Refrigeration system Water Cooled

Semi-hermetic compressor, cascade refrigeration system,

CFC free refrigerant(HFC-507 and HFC-23)

Controller Panel:7-inch LCD Touch panel, Chinese or English display selectable
Operation model:Program or fix point running
Memory capacity:120programs,1200steps, all repeat 999cycles,part repeat 99 cycles.
Accuracy:Temp.:0.1% of F.S±1 digit Humidity:0.1% of F.S±1 digit
Input:Temp.:pt-100 Humidity:pt-100 or ~5V DCV
Ambient Temp. +5ºC~+35ºC
Power AC 380±10% 50Hz ,3 phase 4 wires +Ground Wires
Note:1. We reserve the right to change specifications without prior notice 2. Customized sizes and configurations available

5. About thermal shock test chamber:

High And Low Temprature Thermal Shock Chamber / Thermal Shock Test Equipment  For Automotive Parts Test

6.Tradeshow

High And Low Temprature Thermal Shock Chamber / Thermal Shock Test Equipment  For Automotive Parts Test

Send your message to this supplier
Send Now

High And Low Temprature Thermal Shock Chamber / Thermal Shock Test Equipment For Automotive Parts Test

Ask Latest Price
Watch Video
Brand Name :
KOMEG
Model Number :
TST-360A
Certification :
CE, ISO
Place of Origin :
China, Guangdong
MOQ :
1SET
Price :
negotiation
Contact Supplier
video
High And Low Temprature Thermal Shock Chamber / Thermal Shock Test Equipment  For Automotive Parts Test

KOMEG Technology Ind Co., Limited

Active Member
11 Years
guangdong, dongguan
Since 1990
Business Type :
Manufacturer, Exporter
Total Annual :
1000000 -3000000
Employee Number :
80~200
Certification Level :
Active Member
Contact Supplier
Submit Requirement