Specifications
Place of Origin :
Guangdong, China
Brand Name :
XINMINGHONG
Certification :
RoHS
Price :
To be negotiated
MOQ :
10 bags
Supply Ability :
1000000pcs PER DAY
Packaging Details :
1000PCS/BAG Anti static bag+Carton
Input Voltage(V) :
3.3V
Warranty(Year) :
2-Year
Type :
SMD LED
Lighting solutions service :
Project Installation
Lifespan (hours) :
30000
Working Time (hours) :
30000
Chip Material :
AlGaInP
Emitting Color :
Blue
Luminous Intensity :
10000-15000mcd
Optical Attenuation(%) :
0.001
Power :
0.09W
Power Dissipation :
0.09
Viewing Angle(°) :
15
Color Rendering Index(Ra) :
80
Color Temperature :
470-475NM
Operating Temperature(℃) :
-40 - 85
Storage Temperature(℃) :
-40 - 85
Chip Brand :
Sanan Chip
Warranty :
3 Years
LED Shape :
bullet
Packing :
1000 Pcs/bag
Description
Product Description of 5mm through hole led

Outline dimension of 5mm through hole led:

5mm bullet led diode water clear lens with long lead

Feature of 5mm through hole led:

Avaliable color:red yellow blue green RGB etc.

Low power consumption

Wide view angle

Long lifespan

Package:1000pcs/bag

ROHS Compliant

Application of 5mm through hole led:

Ideal for backlight and indicator

Various colors and lens types available

Absolute Maximum rating of 5mm through hole led:(Ta=25°C)

Parameter Symbol Value Unit
Forward current If 30 mA
Reverse Voltage Vr 5 V
Power dissipation Pd 90 mW
Operationg temperature Top -40∼+85 °C
ESD(Human-body mode -- 2 KV
Storage temperature Tstg -40∼+85 °C
Peak pulsing current(1/8 duty f=1kHz lfP 125 mA

Electrical characteristics of 5mm through hole led:(Ta=25°C)

Parameter Test condition Symbol Value Unit
Min Typ Max
Dominant wavelength If=20mA λd 470 --- 475 nm
Forward voltage If=20mA Vf 3.0 3.2 3.4 v
Luminous intensity If=20mA Iv 10000 --- 15000 mcd
Viewing angle at 50% lv If=10mA 2θ1/2 15 Deg
Resverse current Vr=5v Ir 10 mA

Related Products

Hot sales

1

Dual color red and green 3227 bi-color smd led for charger

2

Hot selling promotion 0805 smd led diode use for car LED display

Certifications

Packaging & Shipping

PACKAGE:

Standard export carton packing. 1000pcs/bag 30bags/box

DELIVERY TIME:

1-7 days after confirming order,detail delivery date should be decided according to
production season and order quantity.

Company Information

Established Shenzhen XINMINGHONG CO.,LTD in 2004 with 100000 grand purification constant termperature and humidity anti-static production workshop,mainly produce various LED,including PCB ,bracket and TOP type directory.

LED for renowned customers around the word. As a team with 20 yeas of management experience in domestic packing enterprises,it witnessed the rapid development of LED industry, accumulated rich experience in LED R&D and packaging technology, formed a scientific management sytem.Our monthly production is over 5000KK pcs.

Our products are the result of experienced manufacture process, rigorous quality control and carefully selected raw material supplies. . The massive production due to the high quality demand and competitive price in LED industry.

MH provides excellent sales service and strong technical supports to our customers.

FAQ

Why choose us?

1,Your inquiry for our products or prices will be replied in 24 hours

2,Protection of your sales area,ideas of design and all your private in formation.

3,We guarantee both quality and service regardless of your order qty.

4,Advanced equipment and goods materials:ASM machine good chip and expoxy resin.

5,If there is LED failure, how can you support?

A:Clients provide us with pictures of the failed products or the samples rejected, our engineers of after sale team will analyze the failure and find out the failure reasons. If the failure was caused by Xinminghong, we will compensate with qualified replacement as fast as we could!

6,Would you offer free samples?

A:Yes, We would offer free samples

7,What about the lead time?

A:It depends on the order quantity. Generally the lead time should be 5-7 working days. For samples, the delivery could be as fast as same day.

Send your message to this supplier
Send Now

5mm bullet led diode water clear lens with long lead

Ask Latest Price
Watch Video
Place of Origin :
Guangdong, China
Brand Name :
XINMINGHONG
Certification :
RoHS
Price :
To be negotiated
MOQ :
10 bags
Supply Ability :
1000000pcs PER DAY
Contact Supplier
video
5mm bullet led diode water clear lens with long lead
5mm bullet led diode water clear lens with long lead

Shen Zhen Xin Ming Hong Electronic Co., Limited

Active Member
5 Years
guangdong, shenzhen
Since 2004
Business Type :
Manufacturer
Total Annual :
2000000-8000000
Employee Number :
50~100
Certification Level :
Active Member
Contact Supplier
Submit Requirement