Place of Origin :
Zhaoqing, Guangdong
Delivery Time :
40-60 work days
Coating Monitoring System :
Real-time
Colour Mode :
Customizable
Coating Control System :
PLC
Coating Method :
Magnetron sputtering
Pump time :
5*10-2pa<5mins
Ultimate vacuum :
6*10-4pa
Water pressure :
more than or equal to 0.2Mpa 3m3/h
water temperature :
is less than or equal to25Celsius system
gas pressure :
0.4-0.8Mpa
Substrate Material :
metal,glss
Chamber Materia :
304 Stainless Steel
Coating Thickness :
Adjustable
Color :
Gold, silver, blue, grey, Etc.
Coating Film Material :
Au, Ag, Al, Cu, SiO2, etc.
Coating Substrate :
glass
Vacuum Chamber Material :
Stainless Steel Or Carbon Steel
Automationlevel :
Fully Automated with Feedback Control
Coolingsystem :
Water Cooling or Air Cooling
Dimensions :
Depends on configuration, approx. 15m x 3m x 2.5m
Coating Color :
Silver, Gold, Rose Gold, Black, etc.
Powersource :
DC, RF, or Pulsed Power Supply