All Aluminum Alloy Conductor ASTM B399 AAAC cable Bare Aluminum Alloy 6201 Wires
Application:
It's mainly used for overhead lines , in transmission and distribution electrical networks, having relatively long spans. They are also used a messenger to support overhead electrical cables.
Electrical properties:
Density@20ºC 2.70 kg/dm
Temperature coefficient @20°C 0.00360 (°C)
Resistivity @20°C 0.0326 Ohms mm²/m
Linear change rate of linear expansion coefficient 23 x10-6(°C)
Technical data sheet:
Cross Sectional Area | Number and Nominal Diameter of Wires | Max. DC. resistance at 20ÜC | Rated strength | Approx. overall diameter | Approx. Weight | Current carrying capacity |
mm2 | No x Ø (mm) | Ω/.m | KN | mm | Kg/Km | Amp |
35 | 7X2.5 | 0.9572 | 10.14 | 7.5 | 93.8 | 170 |
50 | 7x3 | 0.6647 | 14.6 | 9 | 135.1 | 210 |
50 | 19X1.8 | 0.6841 | 14.26 | 9 | 132.7 | 210 |
70 | 19X2.1 | 0.5026 | 19.41 | 10.5 | 180.7 | 255 |
Pictures:



Why you choose us?
- Products comply with GB, IEC, BS, ASTM, DIN, VDE and JIS standards; Customer standard requirments Accepted;
- Certified to ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007;
- Registered capital of $30 million and factory covers an area of 60,000㎡;
- Advanced test equipment and procedures, 100% inspection before factory;
- Enough stocks and the higest efficient shipping time guarranteed;
FAQ
- Is your company a factory or a trade company? --- Factory, more than 20 years in China
- How long can I expect to get the sample?---After you pay the freight charge and send us confirmed files, the samples will be ready for delivery in 3-7 days. The samples will be sent to you via express and arrive in 3~7 days. You can use your own express account or prepay us if you do not have an account.
- What are your payment terms?---We normally accept T/T 30% deposit, 70% balance before delivery as the main payment terms, and other payment can also be negotiated. Trade assurance on is also available.
- What’s the delivery time?---Sample order needs 3~5 days. Formal order depends on the quantity. Usually it needs 7-30 days after get your payment.
- What is your MOQ?---depends on the cable type you need.