4130 SR Wire Line Seamless Drill Pipes NQ HQ Drill Inner Tubes
4130 SR Wire Line Seamless Drill Tubes (NQ/HQ Drill Inner Pipes) are stress-relieved 4130 steel seamless tubes designed for wireline coring in geological exploration. Featuring high tensile strength (≥810 MPa) and toughness after heat treatment, they ensure durability in hard rock formations. Precision-machined with tight tolerances (OD ±0.15mm, straightness ≤0.5mm/m) and smooth inner surfaces (Ra ≤1.6μm), they minimize friction during wireline retrieval. Compatible with NQ (69.9mm OD) and HQ (88.9mm OD) core barrels, they offer robust thread connections (e.g., API standard) for secure assembly, optional nitriding coating for corrosion resistance, and reliability in deep-hole drilling up to 1500m. Ideal for mineral exploration and core sampling.
Chemical Composition
| Steel Grade |
C |
Si |
Mn |
P |
S |
Cr |
Mo |
B |
| 4130 |
0.28-0.33 |
0.15-0.35 |
0.40-0.60 |
≤0.040 |
≤0.040 |
0.80-1.10 |
0.15-0.25 |
|
| 4140 |
0.38-0.43 |
0.15-0.35 |
0.75-1.00 |
≤0.040 |
≤0.040 |
0.80-1.10 |
0.15-0.25 |
|
| 45MnMoB |
0.43-0.48 |
0.17-0.37 |
1.05-1.35 |
≤0.020 |
≤0.015 |
|
0.20-0.25 |
0.001-0.005 |
| 1541 |
0.36-0.44 |
- |
1.35-1.65 |
≤0.040 |
≤0.050 |
|
|
|
| 30CrMnSiA |
0.28-0.34 |
0.90-1.20 |
0.80-1.10 |
≤0.020 |
≤0.015 |
0.80-1.10 |
|
|
Mechanical Properties
| Steel Grade |
Deliver Condition |
Tensile Strength (Mpa) |
Yield Strength (Mpa) |
Elongation (%) |
Hardness (HRC) |
| 4130 |
+ SR |
≥813 |
≥690 |
≥15% |
≥24 |
| 4140 |
QT |
≥950 |
≥850 |
≥14% |
28 - 33 |
| 45MnMoB |
+ N |
≥790 |
≥600 |
≥14% |
- |
| 1541 |
+ SR |
≥813 |
≥690 |
≥15% |
≥24 |
| 30CrMnSiA |
QT |
≥850 |
≥750 |
≥14% |
26 - 31 |
Delivery Condition
- Stress Relief Annealing after Cold Working (+SR) (BKS)
- Normalizing (+N) (NBK)
- Quenching & Tempering (QT)
Frequently Asked Questions
Can you provide a sample to check the quality?
We can provide free sample with same or similar sizes for you to check tube quality. You need to in charge of Express costs.
How about your production capacity?
3000 tons/Month.
What are your terms of payment?
30%TT in advance, Balance to be paid before shipment.
Where is your factory?
Zhangjiagang city, 1.5 hours away from Shanghai.
How can I get the quotation A.S.A.P?
Please send us an inquiry with full details as following, quotation will sent to you A.S.A.P:
- Tube Standard
- Steel Grade
- Tube Size and Size Tolerance
- Tube length
- Quantity
- If any special requirements
How about the minimum order quantity?
Normally for one size above 1 ton.
Welcome to contact us! Thanks.