Specifications
Flow (m³/h) :
15
Delivery Time :
7-15 Working Days
Payment Terms :
L/C, D/A, D/P, T/T, Western Union,
Brand Name :
WEL
MOQ :
Negotiable
Power (kw) :
11
Lift (m) :
165
Packaging Details :
Standard Packaging
Model :
WQX(H)10-165/6-11
Place of Origin :
China
Description
WQX H Black Project Sewage Pump

The WQX H Black project sewage pump is a high-performance solution developed using advanced international technology, specifically engineered to meet the demanding requirements of industrial and municipal applications in China.

Key Advantages
  • Energy Efficiency: Optimized design for significant power savings.
  • Anti-Clogging: Specialized impeller design prevents plugging and winding.
  • Advanced Operation: Features automatic installation and detection capabilities.
  • Versatile Handling: Highly effective for liquids containing solid particles or macro-fibers.
Technical Specifications
Model Flow (m³/h) Lift (m) Power (kw)
WQX(H)6-24-1.1(1.5) 6 24 1.1
WQX(H)10-34-2.2 10 34 2.2
WQX(H)10-44-3 10 44 3
WQX(H)12.5-50-4 12.5 50 4
WQX(H)12.5-60-5.5 12.5 60 5.5
WQX(H)15-65-7.5 15 65 7.5
WQX(H)10-60/3-4 10 60 4
WQX(H)10-80/4-5.5 10 80 5.5
WQX(H)10-115/5-7.5 10 115 7.5
WQX(H)10-165/6-11 10 165 11
Send your message to this supplier
Send Now

Black Project Submersible Sewage Pump 15m3/H Wastewater Submersible Pump

Ask Latest Price
Flow (m³/h) :
15
Delivery Time :
7-15 Working Days
Payment Terms :
L/C, D/A, D/P, T/T, Western Union,
Brand Name :
WEL
MOQ :
Negotiable
Power (kw) :
11
Contact Supplier
Black Project Submersible Sewage Pump 15m3/H Wastewater Submersible Pump
Black Project Submersible Sewage Pump 15m3/H Wastewater Submersible Pump
Black Project Submersible Sewage Pump 15m3/H Wastewater Submersible Pump
Black Project Submersible Sewage Pump 15m3/H Wastewater Submersible Pump

Shanghai Weihu Pump Co., Ltd.

Verified Supplier
1 Years
shanghai, shanghai
Since 2008
Business Type :
Manufacturer
Total Annual :
10000000-50000000
Employee Number :
50~100
Certification Level :
Verified Supplier
Contact Supplier
Submit Requirement