Specifications
Model Number :
G12V190ZLC
Delivery Time :
5 days
Brand Name :
Jichai
Supply Ability :
187
Price :
98
MOQ :
1
Packaging Details :
wooden cases
Certification :
ce
Place of Origin :
China
Description

Jinan Diesel Engine G12V190ZLC Spare Parts Supplier

Cylinder Liner 12VB.01.02C


Piston Z12VB.05.01C


Piston Pin 12VB.05.08A


Piston Ring Set 12VB.05.09B‑PJ


Main Bearing Set 12VB.01.23/24A


Connecting Rod Bearing 12VB.05.10.04/05


Thrust Bearing 12VB.01.25


Connecting Rod Bolt 12VB.05.10.03


Cylinder Head Bolt 12VB.03.01‑11


Intake Valve 12VB.03.22D


Exhaust Valve 12VB.03.37D


Valve Seat 12VB.03.80.02


Valve Guide 12VB.03.80.03


Valve Spring 12VB.03.26


Cylinder Head Gasket 12VB.01.03


Crankshaft Front Oil Seal 12VB.01.40


Crankshaft Rear Oil Seal 12VB.01.41


Overhaul Kit 12VB‑OVERHAUL‑KIT


Oil Filter 12VB.10.06


Fuel Filter 12VB.10.03


Injector 12VB.03.40A


Nozzle ZCKS835


Injection Pump 12V.16.20E


Water Pump 12VB.22.00B


Air Filter K3260


Turbocharger 2012.26.00

Checking items Checking methods Standard value(mm) Limit value(mm) Quality requirements
Appearance checking Eye‑measurement for checking abnormal war, crack and ablation on fit surfaces of camshaft, rocker shaft, roller rocker arm shaft, roller and floating sleeve. —— —— If fit surface scuffed lightly, regrind it; if scuffed seriously, replaced by new one.
Fitting clearance of camshaft supporting journal Measuring journal and bore actual dimension with micrometer 0.10~0.165 0.26 If the clearance is over limit value, replace corresponding bush.
Camshaft thrust clearance Measuring actual clearance between thrust flange and steel washer with feeler 0.11~0.186 0.5 If clearance is over limit value, replace thrust plate by a new one.
Radial run‑out of camshaft supporting journal As in Fig. 4.3‑5, supporting two end journals of camshaft with “V” stand, measuring radial run‑out error middle with micrometer 0.025 0.05 If error is over the limit value, correct the shaft or replace it by new one.
Fit clearance between roller rocker arm and its bush. Measuring the actual dimension of the bush inner hole for rocker arm shaft with micrometer 0.068~0.102 0.20 If actual value is over limit, replace the floating sleeve.
Fit clearance between floating sleeve ex-circle and roller inner hole Measuring the actual dimension of floating sleeve ex-circle and roller shaft with micrometer 0.065~0.111 0.25 If actual value is over limit, replace the floating sleeve.
Fit clearance between floating sleeve inner hole and roller shaft Measuring the actual dimension of floating sleeve inner hole and roller shaft ex-circle with micrometer 0.05~0.088 0.15 If actual value is over limit, replace the floating sleeve.


Send your message to this supplier
Send Now

Jinan G12V190ZLC1 engine overhaul replacement supplier professional maintenance guidance and quick delivery

Ask Latest Price
Model Number :
G12V190ZLC
Delivery Time :
5 days
Brand Name :
Jichai
Supply Ability :
187
Price :
98
MOQ :
1
Contact Supplier
Jinan G12V190ZLC1 engine overhaul replacement supplier professional maintenance guidance and quick delivery
Jinan G12V190ZLC1 engine overhaul replacement supplier professional maintenance guidance and quick delivery
Jinan G12V190ZLC1 engine overhaul replacement supplier professional maintenance guidance and quick delivery
Jinan G12V190ZLC1 engine overhaul replacement supplier professional maintenance guidance and quick delivery

Shandong Hongfan Power Technology Co.,Ltd

Site Member
2 Years
shandong, jinan
Since 2019
Business Type :
Distributor/Wholesaler, Agent, Exporter
Total Annual :
100000-200000
Employee Number :
50~100
Certification Level :
Site Member
Contact Supplier
Submit Requirement