Specifications
Model Number :
MFS1500A
Certification :
UL,VDE,KC,PSE,cUL,CQC
MOQ :
1000 Pieces
Price :
0.016 ~ 0.02 USD/Pieces
Payment Terms :
T/T,Paypal
Supply Ability :
10KKPCS Per Month
Delivery Time :
5-7 Days
Packaging Details :
Tape 20000PCS/Carton (Default) ; Bulk ,10000PCS/Carton
Name :
Miniature Fuse 5A 250V
Speed :
Fast-acting
Rated Current :
5A
Voltage :
250V
Color :
Black(Default)/Red
Size :
8x4x8mm
Shape :
Rectangular
Breaking Capacity :
Low
IEC Designation :
IEC 127-3
I2T :
78 A2.S
Description

PCB Mount Circuit Protection Compact Design Long Leaded PVC Cap Fast Acting Micro Miniature Fuse F 5A 250V

What is a Micro Fuse?

A micro fuse is a radial leaded subminiature fuse, offered in either a cylindrical or rectangular form factor. Micro fuses were originally designed for the U.S. Space Program. The micro fuse is made with either glass, plastic or metal bodies. They are designed to be electrically equivalent to miniature glass cartridge, fuses in a smaller package with higher tolerance to impact and vibration. Micro fuses can plug, in to a PC board mounted fuse holder. Micro fuse voltage, ratings typically range from 65 volts AC to 300 volts AC. Micro fuses with voltage ratings up to 450 volts DC are also available. Micro fuses are offered in fast acting, or time lag, versions. Micro fuses are typically built in accordance with UL 248-14, and CSA C22.2/No.248.14 or IEC 60127-3, standards. Some fuse micro series are also offered in MIL Spec, versions.

Long Leaded PVC Cap Fast Acting Micro Miniature Fuse F 5A 250V PCB Mount Circuit Protection

Scope of application

This product is suitable for various kinds of electronic devices’ circuit over current protection. Widely used in industrial of Battery Charges, Consumer Electronics, Power supplies, Industrial Controllers, etc.

Standards

In accordance with IEC60127-1, IEC60127-3 Standard sheet4, GB9364.1-1997, GB9364.3-1997.

Agency Approvals

Agency Ampere Range Agency File Number
UR 50mA ~ 6.3A E340427(JDYX2)
C-UR 50mA ~ 6.3A E340427(JDYX8)
VDE 50mA ~ 6.3A 40039420
CQC 50mA ~ 6.3A CQC16012154495
PSE 50mA ~ 6.3A PSE16021073
KC 50mA ~ 6.3A SU05052-16004/16005/16006

Specification

P/N Rated current Rated voltage Max. Voltage Drop (mv) I2TMelting Integral(A2.S)
MFS0200A 200mA 250V 1700 0.04
MFS0250A 250mA 250V 1400 0.06
MFS0315A 315mA 250V 1300 0.1
MFS0400A 400mA 250V 1200 0.2
MFS0500A 500mA 250V 1100 0.35
MFS0630A 630mA 250V 650 0.5
MFS0800A 800mA 250V 240 1.3
MFS1100A 1A 250V 200 1.6
MFS1125A 1.25A 250V 200 2.4
MFS1160A 1.6A 250V 190 4.6
MFS1200A 2A 250V 170 7.9
MFS1250A 2.5A 250V 170 12
MFS1315A 3.15A 250V 150 22
MFS1400A 4A 250V 130 29
MFS1500A 5A 250V 130 78
MFS1630A 6.3A 250V 130 97
MFS1800A 8A 250V 100 290
MFS2100A 10A 250V 100 430

Dimension (mm)

Long Leaded PVC Cap Fast Acting Micro Miniature Fuse F 5A 250V PCB Mount Circuit Protection

Materials

NO. Part Name Material
1 Cap Black or Brown Thermoplastic Polyamide PA 6.6, UL 94 V-0
2 Base Black or Brown Thermoplastic Polyamide PA 6.6, UL 94 V-0
3 Fuse element Alloy
4 Lead wire Copper, Tin-plated

Melting Time

% of Ampere Rating(In) Melting Time
150%* In 60 min Minimum
210%* In 30 min Max
275%* In 10 ms~3 s
400%* In 3 ms~300 ms
1000%* In 20 ms Max

Microfuse PCB Mount Holder

Long Leaded PVC Cap Fast Acting Micro Miniature Fuse F 5A 250V PCB Mount Circuit Protection
Long Leaded PVC Cap Fast Acting Micro Miniature Fuse F 5A 250V PCB Mount Circuit Protection

Send your message to this supplier
Send Now

Long Leaded PVC Cap Fast Acting Micro Miniature Fuse F 5A 250V PCB Mount Circuit Protection

Ask Latest Price
Model Number :
MFS1500A
Certification :
UL,VDE,KC,PSE,cUL,CQC
MOQ :
1000 Pieces
Price :
0.016 ~ 0.02 USD/Pieces
Payment Terms :
T/T,Paypal
Supply Ability :
10KKPCS Per Month
Contact Supplier
Long Leaded PVC Cap Fast Acting Micro Miniature Fuse F 5A 250V PCB Mount Circuit Protection
Long Leaded PVC Cap Fast Acting Micro Miniature Fuse F 5A 250V PCB Mount Circuit Protection
Long Leaded PVC Cap Fast Acting Micro Miniature Fuse F 5A 250V PCB Mount Circuit Protection
Long Leaded PVC Cap Fast Acting Micro Miniature Fuse F 5A 250V PCB Mount Circuit Protection
Long Leaded PVC Cap Fast Acting Micro Miniature Fuse F 5A 250V PCB Mount Circuit Protection

Guangdong Uchi Electronics Co.,Ltd

Verified Supplier
13 Years
guangdong, dongguan
Since 2006
Business Type :
Manufacturer, Exporter
Total Annual :
1,500,000-2,500,000
Employee Number :
138~168
Certification Level :
Verified Supplier
Contact Supplier
Submit Requirement