Specifications
Description
The XJ1200 Workover Rig: Powering Oilfield Maintenance with Engineering Excellence
XJ1200 Workover Rig with 2250 kN Hook Load, 14×10 Off-Road Chassis, and API 4F/7K/8C Standards
What Sets It Apart?
  • Massive Capacity: Boasts a 2250 kN maximum hook load, enabling it to handle deep-well interventions and heavy pipe strings with ease.
  • Mobility & Durability: Its 14×10 off-road chassis and modular design ensure seamless transportation across rugged oilfield terrains, while dual engines deliver consistent power for prolonged operations.
  • Safety & Compliance: Built to API 4F/7K/8C standards, it features hydraulic disc brakes and advanced control systems, prioritizing operator safety and regulatory adherence.

This rig isn’t just machinery—it’s a testament to how engineering innovation keeps global energy supplies flowing. Whether it’s repairing a well or optimizing production, the XJ1200 stands ready to deliver results.

Contact for Inquiries

Email: anna.cai@toplandoil.com

WhatsApp: +86 17391602750

Send your message to this supplier
Send Now

XJ1200 Workover Rig with 2250 kN Hook Load, 14×10 Off-Road Chassis, and API 4F/7K/8C Standards

Ask Latest Price
Contact Supplier
XJ1200 Workover Rig with 2250 kN Hook Load, 14×10 Off-Road Chassis, and API 4F/7K/8C Standards

Topland Oilfield Supplies Ltd.

Verified Supplier
2 Years
shanghai, shanghai
Since 2012
Business Type :
Manufacturer, Trading Company
Total Annual :
5000000-8000000
Employee Number :
80~100
Certification Level :
Verified Supplier
Contact Supplier
Submit Requirement