Specifications
Model Number :
Telescopic Tower
Galvanizing standard :
ASTM A123/ ISO 1461
Deploymenttime :
Less than 5 minutes
MOQ :
1 Tons
Delivery Time :
15 Days
Certification :
ISO 9001:2008
Applications :
Surveillance, lighting, communication
Payment Terms :
L/C, T/T
Standard :
GB / ANSI / TIA-222-G, EN 1991-1-4 & EN 1993-3-1
Minimumheight :
2 meters
Operatingtemperaturerange :
-20°C to 60°C
Height :
Up to 30 meters
Maintenance :
Low maintenance with modular parts
Brand Name :
Jiayao
Welding Standard :
AWS D 1.1
Place of Origin :
China
Basetype :
Fixed or mobile base options
Extensionmechanism :
Hydraulic system
Packaging Details :
20GP Or 40HQ
Preservative Treatment :
Hot Dipped Galvanized,painting
Weight :
Approximately 1500 kg
Price :
>=1 Tons,US$25000;>=5 Tons,US$24500
Material :
Aluminum Alloy
Wind Speed :
40m/s
Surfacefinish :
Anodized
Windresistance :
Up to 120 km/h
Safetyfeatures :
Automatic locking mechanism, safety pins
Supply Ability :
100 tons per month
Productname :
Mobile Emergency Communication Tower Trailer with Telescopic Mast for Rapid Deployment
Vertical Deviation :
<1/1000
Description

Mobile Emergency Communication Tower Trailer with Telescopic Mast for Rapid Deployment

Mobile Emergency Communication Tower Trailer with Telescopic Mast for Rapid Deployment

Telescopic Lattice Antenna Communication Tower is a revolutionary vertical structure designed for effortless height adjustment. Its nested sections expand or retract smoothly, making it ideal for aerial work, stage setups, or industrial installations.

Why Choose Our Telescopic Communication Tower?
Lightweight & Durable: Crafted from aerospace-grade steel, it's strong yet easy to transport.
Instant Height Control: Adjust from 3m to 10m in seconds-no tools needed!
Unmatched Stability: Anti-slip base and reinforced joints ensure safety at any elevation.
Versatile Applications: Perfect for construction, events, or maintenance tasks.


Need a comparison chart ? Just ask!

Product Description
Product Details
Height 15-30M
Wind Speed 40M/S
Main Material Steel Tube, Solid rod
Vertical Deviation <1/1000
Preservative Treatment Hot Dipped Galvanized and painting
What is the rising state of COW?
Rising State of COW (Telescopic Tower)‌.The rising state refers to the vertical extension phase, where the telescopic tower deploys its nested sections sequentially using hydraulic or electric actuators. Each section slides outward along precision-guided rails, maintaining structural alignment and load stability. This process is typically controlled via a centralized interface, allowing incremental height adjustment from 6 to 30 meters depending on design. The system incorporates load sensors and anti-tilt mechanisms to ensure safety during ascent. Common applications include mobile communication towers, temporary surveillance platforms, and high-intensity lighting systems deployed at construction or emergency sites.
Mobile Emergency Communication Tower Trailer with Telescopic Mast for Rapid Deployment
What is the lying down process of COW?
Lying Down Process of COW (Telescopic Tower)‌.The lying down process — more accurately termed stowing to horizontal position — involves rotating the fully retracted or partially extended tower from vertical to horizontal orientation around a pivot point at its base. This is achieved through a hydraulic hinge mechanism that lowers the mast slowly and controllably, often with counterweights to balance torque. The process is critical for transportation, storm preparedness, or storage. Safety interlocks prevent movement unless all sections are fully retracted and locking pins are disengaged. Mobile lighting towers and radar masts commonly employ this feature to reduce wind load and enable trailer transport.
Mobile Emergency Communication Tower Trailer with Telescopic Mast for Rapid Deployment
What is the retracting state of COW?
Retracting State of COW (Telescopic Tower)‌.The retracting state is the axial contraction of individual tower sections back into one another, reducing overall height while maintaining vertical alignment. Unlike the lying down process, retraction occurs with the tower still upright. Each section is pulled inward by winches or hydraulic cylinders, guided by telescoping sleeves and secured by mechanical locks at each stage. The sequence is reverse of extension: outermost section retracts first, followed by inner layers. This phase is typically performed before stowing to minimize structural stress and ensure compactness. Retraction is often automated and monitored via position encoders to prevent jamming or misalignment.
Mobile Emergency Communication Tower Trailer with Telescopic Mast for Rapid Deployment
Certifications

Mobile Emergency Communication Tower Trailer with Telescopic Mast for Rapid Deployment

Gular customers

Mobile Emergency Communication Tower Trailer with Telescopic Mast for Rapid Deployment

Company Information

Mobile Emergency Communication Tower Trailer with Telescopic Mast for Rapid Deployment

Our Services

Mobile Emergency Communication Tower Trailer with Telescopic Mast for Rapid Deployment

Send your message to this supplier
Send Now

Mobile Emergency Communication Tower Trailer with Telescopic Mast for Rapid Deployment

Ask Latest Price
Watch Video
Model Number :
Telescopic Tower
Galvanizing standard :
ASTM A123/ ISO 1461
Deploymenttime :
Less than 5 minutes
MOQ :
1 Tons
Delivery Time :
15 Days
Certification :
ISO 9001:2008
Contact Supplier
video
Mobile Emergency Communication Tower Trailer with Telescopic Mast for Rapid Deployment
Mobile Emergency Communication Tower Trailer with Telescopic Mast for Rapid Deployment
Mobile Emergency Communication Tower Trailer with Telescopic Mast for Rapid Deployment
Mobile Emergency Communication Tower Trailer with Telescopic Mast for Rapid Deployment
Mobile Emergency Communication Tower Trailer with Telescopic Mast for Rapid Deployment
Mobile Emergency Communication Tower Trailer with Telescopic Mast for Rapid Deployment

Jiayao Co., Ltd.

Verified Supplier
3 Years
hebei, hengshui
Since 2015
Business Type :
Manufacturer, Trading Company, Other
Total Annual :
10000000-15000000
Employee Number :
80~100
Certification Level :
Verified Supplier
Contact Supplier
Submit Requirement