Cold Cast Polyurethane Mold Glue For Shoe Molds EM480-A &EM480-B
Technical Data Sheet
Description
This system materials is Bi-component. A is polyol component, and B is MDI-terminated pre-polymers.
Application
This system material is used to produce various Pu mould, such as shoe mould, concrete mould, etc. It cansubstitute silicone rubber to produce“artificial culture stone”.
Characteristic
It has excellent processing properties, cured under room temperature, short demould time, and the color canbe changed by adding pigment. The final products are transparent which enjoy good abrasion resistance, water resistance, good resilience. The hardness is in the 40 to 90 shore A hardness range.
Product Specification
| Type | EM480-A | EM480-B |
| Viscosity (mPa·s/25℃) | 1700±200 | 670±150 |
| Appearance | Light yellow transparent liquid | Colorless or light yellow transparent liquid |
Operation introduction
| Ratio A:B | 1:1 |
| Operating Tem. (℃) | 25-40 |
| Gel Time (min/30℃) | 6-8 |
| Appearance of final products | Light yellow elastomer |
Physical Properties
| Hardness (shore A) | 80±2 |
| Tensile Strength (Mpa) | 10 |
| Elongation at break (%) | 500-700 |
| Tear strength (kN/m) | 40 |
| Rebound (%) | 50 |
| Specific gravity (25℃) (g/cm3) | 1.10 |
Storage
Store in a cool and dry place,If you can’t use it up at one time, Pls fill nitrogen gas and then seal it.
Shelf life
The storage time of original packing is 6 month at the above condition from the date of production.
Package
20kg or 200kg per steel drum
Operation by manual
1. Take certain A component to make reserve.
2. Calculate B component to make reserve.
3. Pour B component to A component and stir evenly.
4. Cast the mixture of step 3 to the mould.
5. Open the mould when the product is hard.
6. Post cure 16 hours at 100℃.
Note: The mixture in the step 3 can be vacuumized to get rid of bubble.
Operation by casting machine
1. Put some A component into A tank, vacuumize to make reserve.
2. Put some B component into B tank, vacuumize to make reserve.
3. Cast the two materials according the ratio to the mould.
4. Open the mould when the product is hard.
5. Post cure 16 hours at 100℃.