Specifications
Packaging Details :
20kg/barrel,200kg/barrel, Weight can be tailored based on specific requirements.
Installation :
5-7 Day Full Installation
Features :
Fast Installation, Minimal Downtime
Place of Origin :
Huizhou, Guangdong, China
Certification :
ISO 9001 (Quality Management) ,ISO 14001 (Environmental Management),CE
Service_Life :
8-10 Years
MOQ :
20KG& 500 sqm
Type :
Fast-Lay EPDM Surface
Name :
EPDM Rubber Surface
Application :
Renovations, Holiday Projects
Brand Name :
lida&lvhuan
Payment Terms :
EXW
Impact_Absorption :
40-50%
Price :
between 18 and 52 USD
Delivery Time :
Normal delivery time: Shipment within 15 days after order confirmation
Structure :
Quick-Cure PU + EPDM Top
Supply Ability :
Monthly supply: 1000–12000 tons&The quantity ranges from 500,000 to 2,000,000 square meters, but it mainly depends on the product.
Thickness :
10-15mm
Model Number :
Please refer to the model numbers in the product catalog
Description
Rapid‑Install EPDM Sports Surface (For Renovations & Holidays)
Key Advantages:
  • Fast‑cure PU binder system
  • Recycled base + standard or premium top options
  • Usable in 48 hours after installation
  • Ideal for school holiday projects and urgent renovations
  • 8–10 year service life
Product Overview

The Rapid‑Install EPDM Sports Surface is designed for tight schedules. Using a special fast‑cure PU binder, the base layer cures in 6–8 hours (normally 24h) and the top layer cures in 12 hours (normally 48h). A complete 13mm EPDM surface (recycled base + EPDM top) can be installed by a 4‑person crew in 5–7 days, compared to 12–15 days for standard systems. The surface is ready for use within 48 hours of finishing the top coat. Perfect for school playgrounds that must be ready before term starts, or community courts needed for a weekend event.

Ideal for: school summer/winter break projects, community court renovations, club facility upgrades, and last‑minute event preparations.

Technical Specifications – Installation Focus
Parameter Value
Total Thickness 13mm (10+3)
Base layer cure time 6–8 hours
Top layer cure time 12 hours
Time to use 48 hours after top coat
Installation rate 600–800 m²/day (4 workers)
Impact absorption 30–40% (standard)
Service Life 8–10 years
Installation Comparison
Step Standard System Rapid‑Install System
Base prep 1–2 days 0.5 day (wash only)
Base layer pour & cure 1 day + 24h 1 day + 8h
Top layer spray & cure 1 day + 48h 1 day + 12h
Total 12–15 days 5–7 days
Applications – Time‑sensitive
  • School playgrounds (must finish before term starts)
  • Community court renovations with event deadlines
  • Club facility upgrades before tournament season
  • Urgent replacement of damaged sections
Case Studies (Rapid‑Install)
Country Project Area Install time Year
Malaysia International school (holiday project) 1,200 m² 6 days 2024
Saudi Arabia Community court (event deadline) 800 m² 5 days 2025
Chile Club playground (season start) 500 m² 5 days 2024
Packaging & Shipping

Same as standard. Fast‑cure binder shelf life: 2 months. Lead time 15 days. No MOQ.

FAQ – Rapid‑Install

Q: Does fast cure affect durability?
→ No. Final mechanical properties meet all relevant standards. Only the curing speed is increased.

Q: Can we use recycled base with this system?
→ Yes. The fast‑cure binder works with both recycled and virgin base granules.

Contact: zhu@ldsflooring.com | WhatsApp +86 18928360800

Send your message to this supplier
Send Now

10mm - 15mm EPDM Rubber Surface Recycled Base Outdoor Playground Flooring For Renovations And Holidays

Ask Latest Price
Packaging Details :
20kg/barrel,200kg/barrel, Weight can be tailored based on specific requirements.
Installation :
5-7 Day Full Installation
Features :
Fast Installation, Minimal Downtime
Place of Origin :
Huizhou, Guangdong, China
Certification :
ISO 9001 (Quality Management) ,ISO 14001 (Environmental Management),CE
Service_Life :
8-10 Years
Contact Supplier
10mm - 15mm EPDM Rubber Surface Recycled Base Outdoor Playground Flooring For Renovations And Holidays
10mm - 15mm EPDM Rubber Surface Recycled Base Outdoor Playground Flooring For Renovations And Holidays

Guangdong Lvhuan Environmental Protection Technology Co., Ltd.

Verified Supplier
1 Years
guangdong, huizhou
Since 2014
Business Type :
Manufacturer, Trading Company
Total Annual :
300-1200
Employee Number :
200~300
Certification Level :
Verified Supplier
Contact Supplier
Submit Requirement