A steel structure hangar is a large-span building specifically designed for aircraft storage, maintenance, and assembly. Its main load-bearing system is constructed using high-strength steel components.
It features a column-free internal layout (spans typically exceeding 100 meters) and high clearance, making it ideal for small, medium, and large passenger aircraft, transport aircraft, and helicopters. Prefabricated steel components allow for rapid on-site assembly, significantly reducing construction time.
With years of manufacturing experience, we optimize structural parameters and adjust supporting equipment based on actual aircraft dimensions, regional climate conditions, and functional requirements. We provide full-process services from design and manufacturing to installation and after-sales support.
| Name | Steel Structure Hangar |
|---|---|
| Main Steel Frame | Column: H section steel Q355B, alkyd painting |
| Beam: H section steel Q355B, alkyd painting | |
| Steel Purlin | Roof purlin: C or Z shape, galvanized steel Q235B |
| Wall purlin: C or Z shape, galvanized steel Q235B | |
| Cladding Material | Roof: PPGI steel sheet, or sandwich panel (EPS, Fiberglass, Rockwool, PU) |
| Wall: PPGI steel sheet, or sandwich panel (EPS, Fiberglass, Rockwool, PU) | |
| Accessories | Bolts: Ordinary, high strength Gutter: Galvanized steel plate, or stainless steel Windows: Aluminum alloy, or PVC material Doors: Sliding or rolling door Downpipes: PVC pipe, or metal pipe Edge cover: PPGI steel sheet 0.5mm thickness Ventilation: Stainless steel ventilation |
We are a steel structure manufacturing factory. Customers are welcome to visit our factory for inspection at any time.
Strict product quality control is our tenet. Each product undergoes comprehensive testing procedures and must pass 100% quality inspection before delivery.
You can provide us your drawings for production, or we can design according to your requirements if you don't have a clear plan. We provide customized plans based on local climatic conditions.
30% deposit is paid in advance, with the balance paid before shipment. Payment terms can be negotiated according to specific project requirements.