Specifications
Brand Name :
Harzone
Place of Origin :
China
MOQ :
negotiation
Payment Terms :
According to detailed order
Delivery Time :
negotiation
Packaging Details :
According to detailed order
Material :
Steel bridge
Feature :
Reusable
Capacity :
Heavy loading capacity
Structure :
Simple
Status :
Sefl Fold and Unfold
Description

Iron Fast Bridge / Emergency Bridge / Mechanized Bridge

Iron Fast Bridge / Emergency Bridge / Mechanized Bridge With 21m Length is mainly used to found a bridge with a length of 21m long and a width of 3.3m to guarantee all classes of trucks with a tracked load of up to 60 tons or an axle load of up to 17 tons to go through small medium rivers and dry gaps promptly. It is sort of emergency equipment carried by automobile and does erection and retrieval by erection vehicle.
Iron 3.3m Width Mechanized Bridge For Emergency

Specifications for Heavy Mountain Bridge

Tracked load / axle load

55t / 17t

Outline dimension (L*W*H)

13*3.3*3.6m

Gross weight

32.5t

Bridge weight

10.5t

Bridge length

21m

Negotiating length (on hard banks)

19m

Section length

10.63m

Bridge width (when expanding)

3.3m

Track width

1.15m

Section height

0.95m

End section height

0.35m

Operator

2-3

Erection time

10 min

Max. longitudinal slope / lateral slope

±10% / ±5%

Allowable bank height difference

5%

Send your message to this supplier
Send Now

Iron 3.3m Width Mechanized Bridge For Emergency

Ask Latest Price
Brand Name :
Harzone
Place of Origin :
China
MOQ :
negotiation
Payment Terms :
According to detailed order
Delivery Time :
negotiation
Packaging Details :
According to detailed order
Contact Supplier
Iron 3.3m Width Mechanized Bridge For Emergency
Iron 3.3m Width Mechanized Bridge For Emergency

CHINA HARZONE INDUSTRY CORP.,LTD.

Verified Supplier
13 Years
hubei, wuhan
Since 1967
Business Type :
Manufacturer, Exporter, Trading Company
Total Annual :
200 Million USD-205 Million
Employee Number :
2000~2000
Certification Level :
Verified Supplier
Contact Supplier
Submit Requirement